Rescheduling Discrete Jobs
You can reschedule standard and non-standard discrete jobs with and without routings. You can enter job start and completion dates earlier than the current date to maintain relative date priorities for department schedules and material requirements. You can also reschedule discrete jobs by rescheduling their operations. See: Adding and Updating Operations and Midpoint Rescheduling.
If you change a job quantity, the system automatically prompts you to reschedule the job.
Prerequisites
2. Enter the Name of the job.
3. In the Dates region, enter either the Start or Completion date and time.
For standard jobs, if you enter a start date and time, the completion date and time are automatically forward scheduled based on the assembly's routing. Similarly, if you enter a completion date and time, the start date and time are automatically backward scheduled based on the assembly's routing. You can enter a past due start date to forward schedule a job that should have started before the current date. You cannot enter a start date and time greater than the completion date and time.
For non-standard jobs, the same forward and backward scheduling logic is applied. However, for non-standard jobs, scheduling is based on the routing reference not the assembly's routing.
Note: If your job is non-standard and has a routing reference that has no routing, the fixed and variable lead times of the routing reference are used to calculate the start or completion date and time.
1. Navigate to the Discrete Jobs window.
3. In the Dates region, enter either the Start or Completion date and time or enter both the Start or Completion date and time.
For standard jobs without routings, you can enter either the start date and time or the completion date and time. If you enter a start date and time, the lead time for the job is calculated by adding the job assembly's fixed and variable lead times and multiplying this sum by the job quantity. The completion date and time are then automatically forward scheduled using this lead time. Similarly, if you enter a completion date and time, the start date and time are automatically backward scheduled using this lead time. Standard jobs can also be manually scheduled by entering both the start and the completion date and time.
For non-standard job without routing references, both the start and the completion dates and times must be entered.
1. After changing your start quantity and saving your work, the Schedule Discrete Job window appears.
Select a scheduling method:
Forwards from start date: The completion date is cleared and the job is forward scheduled using the start date and time.
Backwards from completion date: The start date is cleared and the job is backward scheduled using the completion date and time.
Manual: For jobs without routings and operations, you have the option to reschedule by accepting the current job start and completion dates.
2. Choose OK to save your work.
See Also
Defining Discrete Jobs Manually
Changing Discrete Jobs
Detailed Scheduling
Discrete Rescheduling