Releasing Repetitive Schedules
You must release a repetitive schedule to production before transacting against it. Releasing a repetitive schedule with a routing automatically loads the total number of assemblies to be built for the repetitive schedule into the Queue intraoperation step of the first operation. If PO Move or PO Receipt resource requirements exist at the first operation, purchase requisitions are automatically generated for these resources.
To release a single repetitive schedule:
The Repetitive Schedules Summary window appears with the results of the query.
To release several repetitive schedules:
See Also
Job and Repetitive Schedule Status Changes
Repetitive Schedule Status Control