The Capture Workload: Plan Environment page is shown.

On the right of the page, the following text appears: Step 1 of 5. The Cancel button is to the left of the text and the Next button is to the right of the text.

The following text appears:

Database database

Logged In As IMMCHAN

The following prerequisites should be met before proceeding to capturing the workload to avoid potential problems.

It is highly recommended to meet and acknowledge each of the following prerequisites.

A table follows with the following columns: Prerequisite, Acknowledge.

Row 1 has the following values: Restarting the database prior to workload capture is recommended for the best workload replay result. Consider scheduling the workload capture at a time when the database can be restarted., (deselected).

Row 2 has the following values: Make sure there is enough disk space to hold the captured workload. Consider doing a short duration workload capture and use it for estimating disk space requirement of a full workload capture., (deselected).

Row 3 has the following values: Make sure you can restore the replay database to match the capture database at the start of the workload capture. A successful workload replay depends on application transactions accessing application data identical to that on a capture system. Common ways to restore application data state include point-in-time recovery, flashback, and import/export., (deselected).

End of description.