This screenshot shows the Step 4: Verify Connector Form Names page on which the entries listed at the end of the "Step 1: Provide Basic Information Page" and "Step 2: Specify Parameter Values Page" sections and the changes described at the end of the "Step 3: Modify Connector Configuration Page" section have been made.