This screen shows part of the Create or Schedule PDF Report page. It includes the following components, listed from top to bottom:
Create or Schedule PDF Report region, which contains the Category Name list, and to the right of it, the Report Name list.
Schedule region, which has, from left to right, Run followed by the Immediately, Specify Schedule, and Select Schedule radio buttons. Specify Schedule is selected, so following it are, from top to bottom are: Repeat list (with the Run Time and Timzone lists to its right), Interval(Days) field, Start Date check box and field, and End Date checkbox and field. To the right of each of the the Start Data and End Date check boxes is a calendar icon for selecting the date. If you want to type in the date, enter it in this format for US English: MM/DD/YYYY.