This appendix contains the following topics:
The following table lists the JD Edwards EnterpriseOne Demand Flow Manufacturing reports, sorted alphabetically by Report ID.
Report ID and Report Name | Description | Navigation |
---|---|---|
RF30L110 | Print the standard sequence of events that you have created for a process. | Sequence of Events Management (GF30L22), Standard Sequence of Events
Click the Edit button on the Search for Standard Sequence of Events form. Click the Save and Print SSOE button. |
RF30L115 | Print the sequence of events that you have created for an item and process. | Sequence of Events Management (GF30L22), Sequence of Events
Click the Edit button on the Search for Sequence of Events form. Click the Save and Print button. |
RF30L704 | Print a table listing the processes included in the product synchronization as well as the calculation results for throughput, output and scrap. | Line Design Management (G30L21), Product Synchronizations
Click the Print Last Calculated button on the Manage Product Synchronizations form. |
RF30L950 | Print operational definition header records. | Line Design Management (G30L21), Operational Definition
Click the Find and then the Define button on the Search for Operational Definition form. Click the Print button on the Define Operations form. |
RF30L951 | Print the operational definition detail records. | Line Design Management (G30L21), Operational Definition Maintenance
Click the Find and then the Manage Operational Definition button on the Search for Operational Definition form. Click the Print button on the Manage Calculated Operational Definition form. |
RF34R012A | After creating a resource simulation, print a report of the results. | Click the Print button on the Execute Resource Simulation form. |
RF34S003 | Print daily plan information based on a user-defined data selection. | Demand Flow Daily Management (GF30L11), Print Daily Plan |
RF34S004 | Print the sequence records you generated for a daily plan. | Demand Flow Daily Management (GF30L11), Print Daily Sequence |
R8930L501P | (Optional)
If you have installed a release prior to JD Edwards EnterpriseOne 8.11 SP1, run this batch program to update the work center branch/plant field in several tables within a scenario for integration with JD Edwards Enterprise One base Manufacturing. |
Select R8930L501P from Batch Versions. |
Some of these reports have processing options that you can use to control how the report is processed.
Set the following processing options:
These processing options provides parameters for the information that the report displays.
Specify the lowest sequence number at which to start printing the standard sequence of events Values are:
Blank: Prints records from the starting sequence number on the standard sequence of events to the last sequence number.
Any positive numeric value: Prints records from the specified sequence number to the last sequence number.
Specify the highest number to print on the standard sequence of events. Values are:
Blank: Prints records from the starting sequence number up to the last sequence number on the standard sequence of events
Any positive numeric value: Prints from the starting sequence number to the sequence number specified in the processing option.
Specify whether the system displays standard sequences of events only for the active scenario. Values are:
Blank: Displays standard sequences of events for all scenarios.
1: Displays only standard sequences of events for the active scenario.
Specify whether the system displays feeder path information on the report. Values are:
Blank: Does not display.
1: Displays.
Specify whether the system displays the TQC description on the report. Values are:
Blank: Does not display.
1: Displays.
Set the following processing options:
These processing options provides parameters for the information that the report displays.
Specify whether the system displays feeder path information on the report. Values are:
Blank: Does not display.
1: Displays.
Specify whether the system displays the TQC description on the report. Values are:
Blank: Does not display.
1: Displays.
Specify whether the system displays components consumed on the report. Values are:
Blank: Does not display.
1: Displays.
Set the following processing options:
This processing option controls the version the system uses for the Daily Planning and Sequencing program (PF34S002).
If you leave this processing option blank, the system uses the ZJDE0001 default version.
If you are upgrading your JD Edwards EnterpriseOne Demand Flow Manufacturing system from a previous release to the JD Edwards EnterpriseOne 8.11 SP1 release, you can run this batch program to update the following tables within a scenario with work center branch/plant information if you are integrating JD Edwards EnterpriseOne Demand Flow Manufacturing with JD Edwards EnterpriseOne Manufacturing:
If you do not integrate JD Edwards EnterpriseOne Demand Flow Manufacturing with JD Edwards EnterpriseOne Manufacturing, run this batch program, to clear the Work Center and Work Center Branch fields in these tables.
Set the following processing options:
These processing options control which data the system updates.
Run this batch program for a specific scenario.
Determine which branch/plant you want to use as a default work center branch in the tables.
Update the tables if you do not integrate JD Edwards EnterpriseOne Demand Flow Manufacturing with D Edwards EnterpriseOne Manufacturing. In this case, it is recommended to clear the Work Center and the Work Center Branch fields in the tables.