12/12
Index
A B C D E F I J L M N O P Q R S T U V W
A
- Account Balances table (F0902), 5.4.1.1, 5.5.1.2
- account classifications
-
- overview, 3.4.1
- setting up, 3.4.5
- Account Ledger table (F0911), 5.5.1.2, 6.2.1
- actual cost rollup, 6.2.1
- actual costs
-
- rolling up to the project workbench, 6.2.1
- Add Quote form, 4.5.3
- Additional Task Information form, 4.3.3
- Add/Revise Project form, 3.5.3, 4.2.2
- Add/Revise Project program (P31P011), 4.2.1, 4.3.2
- Add/Revise Projects form, 4.2.4
- assignments
-
- resource, 4.3.2.2
- task, 4.3.2.2
- attaching existing work orders to projects, 5.4.1.3
- audit trails
-
- creating for commitments, 5.5.5
B
- Bill of Material Structure Analysis program (R30601), 5.3.1.1
- budgets
-
- loading, 5.2.1
- uploading job cost budgets, 5.2.3
C
- chart of accounts
-
- adding for a project, 3.5.4
- overview, 3.5.1.1
- Commitment Document Types (40/CT), 3.3
- Commitment Integrity report (R40910), 5.5.1.2
- Commitment Rebuild program (R31P993)
-
- processing options, 5.5.4
- usage, 5.5.1.2, 5.5.5
- commitments
-
- creating an audit trail, 5.5.5
- creating financial, 5.5.1.2
- creating for inventory, 5.5.1.1
- creating for projects, 5.5.1
- reviewing inventory for project work orders, 5.5.3
- Configured Item Revisions program (P3210), 4.3.2
- Copy Cost Codes form, 3.5.3, 3.5.4
- Cost Classification (31P/CC), 3.3
- Cost Classification program (P31P301)
-
- processing options, 3.4.3
- usage, 3.4.1
- Cost Classification Table (F31P21), 2.4
- cost classifications
-
- overview, 3.4.1
- setting up, 3.4.4
- costs
-
- assigning estimated, 4.3.7.2
- assigning planned, 4.3.7.2
D
- dependency types, 4.4.1
- Detail Message Revisions form, 5.3.3, 5.3.5
- Distribution Requirements Planning (34/DR), 3.3
- Document Type Maintenance program (P40040), 3.1.1
- DRP Unadjusted (34/DU), 3.3
E
- Edit And Lock All Tasks form, 4.3.3, 4.3.6, 4.4.3, 4.4.4
- Edit Tasks form, 4.3.3, 4.3.6, 4.4.3, 4.4.4, 5.4.2, 5.4.4, 5.4.6, 5.4.7
- Electronic Mail Boxes (02/MB), 3.3
- Encumbrance Rollover program (R4317), 5.5.1.2
- Engineer to Order
-
- project accounting, 6.1.2.3
- project alerts, 6.3.1
- project close, 6.4.1
- project planning, 5.1
- project reports, 6.3.1
- setting up the system, 3.1
- setup, 3.1
- system features, 2.3
- tables, 2.4
- task types, 3.1.1
- engineer to order project phases, 2.1
- estimated costs
-
- assigning, 4.3.7.2
- export process, 3.6.1
- Export to MS-Project program (R31P404)
-
- processing options, 3.6.2
- usage, 3.6.3
- Extended Job Master table (F5108), 3.5.1, 4.2.1
F
- F0902 table, 5.4.1.1, 5.5.1.2
- F0911 table, 5.5.1.2, 6.2.1
- F3102 table, 6.2.1, 6.3.4
- F3111 table, 6.3.4
- F3115 table, 6.1.2.2
- F31P01 table, 2.4, 5.4.8
- F31P10 table, 2.4
- F31P11 table, 2.4, 4.5.1
- F31P12 table, 2.4
- F31P21 table, 2.4
- F31PUI01 table, 2.4
- F31PUI02 table, 2.4
- F3412 table, 5.3.1.3
- F3413 table, 5.3.1.3
- F4080 table, 2.4, 5.4.1.2
- F41021 table, 5.5.1.1, 6.1.2.1, 6.3.6
- F410211 table, 2.4, 5.3.1.2, 5.5.1.1, 6.1.2.1
- F4211 table, 5.4.1.2
- F4311 table, 5.4.1.2, 5.4.1.4
- F43121 table, 5.4.1.4
- F43199 table, 5.4.1.1, 5.5.1.2, 6.3.4
- F4801 table, 4.2.1, 4.3.2, 6.3.2
- F4801T table, 4.3.2.1, 5.5.1.2, 6.2.1
- F4801T1 table, 2.4
- F5108 table, 3.5.1, 4.2.1
- financial commitments
-
- creating, 5.5.1.2
- creating an audit trail, 5.5.5
- defining inventory interfaces, 3.1.3
- defining line type constants, 3.1.3
- defining line types, 3.1.3
I
- implementation steps
-
- application-specific, 1.3.2
- global, 1.3.1
- overview, 1.3
- Import from MS-Project program (R31P801)
-
- processing options, 3.6.2
- usage, 3.6.4
- import process, 3.6.1
- integration with Microsoft Project, 3.6.1
- integrations
-
- Capital Asset Management, 1.2.6
- Contract Billing, 1.2.10
- Inventory Management, 1.2.1
- Job Cost, 1.2.5
- Procurement, 1.2.9
- Product Data Management, 1.2.2
- Project Costing, 1.2.5
- Quality Management, 1.2.7
- Requirements Planning, 1.2.4
- Sales Order Management, 1.2.8
- Service Billing, 1.2.10
- Shop Floor Management, 1.2.3
- inventory commitments
-
- creating, 5.5.1.1
- reviewing for project work orders, 5.5.3
- Inventory Interface (H40/IV), 3.3
- issues and completions for project work orders, 6.1.2.1
- Item Location table (F41021), 5.5.1.1, 6.1.2.1, 6.3.6
J
- job cost budgets
-
- uploading, 5.2.3
- Job Cost Code Structures program (P51091), 3.5.1.1
- job cost integration
-
- overview, 3.5.1
- Job Cost Master Revisions program (P51006), 3.5.1
L
- List of Records Locked table (F31PUI02), 2.4
M
- Maintenance Material Planning (34/MM), 3.3
- Master Planning Schedule - Multiple Plant program (R3483), 5.3.1.4, 5.3.4
- Master Production Schedule (34/MS), 3.3
- Material Requirements Planning (34/MR), 3.3
- Message Summary program (P3401), 5.3.1.3
- messages
-
- processing for multiplant project requirements planning, 5.3.5
- Microsoft Project
-
- engineer to order export process, 3.6.1
- engineer to order import process, 3.6.1
- MPS Time Series program (P3413), 5.3.1.3
- MPS/MRP/DRP Lower Level Requirements table (F3412), 5.3.1.3
- MPS/MRP/DRP Summary table (F3413), 5.3.1.3
- MRP/MPS Detail Message Revisions program (P3411), 5.3.1.3
- MRP/MPS Requirements Planning program (R3482), 5.1
- multiplant project requirements planning
-
- processing messages, 5.3.5
- multiplant requirements plan for a project
-
- generating, 5.3.4
- multiple plants
-
- project requirements planning, 5.3.1.4
N
- net change, 6.1.2.2
- Net Change Processing program (R31430), 6.1.2.2
- Net Change Transaction table (F3115), 6.1.2.2
O
- online proposals, 4.5.1.2
- Online Proposals program (P31P101), 4.5.1, 4.5.1.2
- online quotes, 4.5.1.2
- order costs
-
- updating related, 5.4.8
- Order Detail form, 5.4.2, 5.4.3
- Order Processing program (R31410), 4.3.2.1, 4.3.7.2
- Order Type (48/OT), 3.3
- output
-
- project requirements planning, 5.3.1.3
P
- P0150 program, 4.5.2
- P3111 program, 4.3.7.2, 5.4.4
- P31114 program, 3.6.4, 6.1.2.1
- P3112 program, 4.3.7.2
- P311221 program, 4.3.2.1
- P31P001 program
-
- processing options, 4.2.3
- usage, 5.4.4
- P31P011 program, 4.2.1, 4.3.2
- P31P100 program
-
- processing options, 4.5.4
- usage, 4.2.1, 4.5.1
- P31P101 program, 4.5.1, 4.5.1.2
- P31P201 program, 5.4.1
- P31P204 program
-
- processing options, 5.4.5
- usage, 5.4.1.2
- P31P301 program
-
- processing options, 3.4.3
- usage, 3.4.1
- P31P301 table, 6.2.1
- P3210 program, 4.3.2
- P3401 program, 5.3.1.3
- P3411 program, 5.3.1.3
- P3413 program, 5.3.1.3
- P40040 program, 3.1.1
- P4021 program, 5.3.1.3
- P410211 program, 5.5.1.1
- P410211W program, 6.1.2.1
- P41202 program, 5.5.1.1
- P4310 program, 5.4.1, 5.4.3
- P4312 program, 5.5.1.1
- P48331 program, 4.3.2.2
- P51006 program, 3.5.1
- P51091 program, 3.5.1.1
- planned costs
-
- assigning, 4.3.7.2
- planning and scheduling, 4.4.1
- Plant Maintenance Management (34/PM), 3.3
- P.O. Detail Ledger File - Flexible Version table (F43199), 5.4.1.1, 5.5.1.2, 6.3.4
- Post Committed Costs to Jobs program (R00932), 5.5.1.2
- Post General Journal program (R09801), 5.5.1.2
- Production Cost table (F3102), 6.2.1, 6.3.4
- project accounting, 6.1.2.3
- Project Accounting (31P/AI), 3.3
- project alerts, 6.3.1
- Project Attributes table (F31P01), 2.4, 5.4.8
- Project Billing Method (31P/AI), 3.3
- project budgets to job cost budgets
-
- loading, 5.2.1
- project close, 2.1.4
- Project Close Analyzer program (R31P403)
-
- processing options, 6.4.3
- usage, 6.4.2
- project close process, 6.4.1
- Project Commitment Detail Inquiry program (P410211), 5.5.1.1
- Project Commitment Detail table (F410211), 5.3.1.2, 5.5.1.1, 6.1.2.1
- Project Commitment Detail Table (F410211), 2.4
- Project Commitment Detail Window program (P410211W), 6.1.2.1
- project commitments
-
- creating, 5.5.1
- overview, 5.5.1
- Project Cost report (R31P401)
-
- processing options, 6.3.5
- usage, 6.3.4
- project cost reports
-
- running, 6.3.4
- project costs, 4.3.2.1
- project execution and control, 2.1.3, 6.1.2
- project header information
-
- creating, 4.2.1
- project initiation, 2.1.1, 4.1
- Project Inquiry form, 4.2.2
- Project Inventory report (R31P402)
-
- processing options, 6.3.7
- usage, 6.3.6
- project items for resale
-
- purchasing, 5.4.1.2
- project life cycle, 2.2
- Project life cycle diagram, 2.2
- project materials
-
- entering purchase orders for, 5.4.3
- purchasing, 5.4.1.1
- project orders
-
- creating, 5.4.1
- project phases, 2.1
- project planning, 2.1.2, 5.1
- project queries
-
- working with, 4.3.4
- Project Quote Detail table (F31P11), 2.4, 4.5.1
- Project Quote Header table (F31P10), 2.4
- Project Quote Inactive Reason Code (31P/RC), 3.3
- Project Quote Revisions form, 4.5.3, 4.5.5
- Project Quote Status (31P/QP), 3.3
- project quotes
-
- creating, 4.5.5
- Project Quotes program (P31P100)
-
- processing options, 4.5.4
- usage, 4.2.1, 4.5.1
- project reports, 6.3.1
-
- Project Cost report (R31P401), 6.3.4
- Project Inventory report (R31P402), 6.3.6
- Project Schedule report (R31P400), 6.3.2
- project requirements planning
-
- generating, 5.3.1.2
- overview, 5.3.1
- setup considerations, 5.3.1.1
- project requirements planning for multiple plants, 5.3.1.4
- project requirements planning generation, 5.3.1.2
- project requirements planning output, 5.3.1.3
- Project Schedule report (R31P400)
-
- processing options, 6.3.3
- usage, 6.3.2
- project schedule reports
-
- running, 6.3.2
- project status codes, 4.5.1.1
- project task scheduling, 4.4.1
- project tasks
-
- adding, 4.3.7
- overview, 4.3.2
- revising, 4.3.7
- scheduling, 4.4.1
- project work orders
-
- completing, 6.1.2.1
- issuing, 6.1.2.1
- project workbench
-
- rolling up actual costs, 6.2.1
- Project Workbench program (P31P001)
-
- processing options, 4.2.3
- usage, 5.4.4, 5.4.7
- projects
-
- attaching existing work orders, 5.4.1.3, 5.4.7
- closing, 6.4.1
- creating, 4.2.4
- creating orders, 5.4.1
- creating related orders, 5.4.6
- overview, 4.3.1
- reviewing related orders, 5.4.6
- scheduling, 4.4.5
- unlocking, 4.3.5
- working with, 4.3.6
- project-specific material
-
- defining, 3.1.2
- PRPprojectrequirements planning, 5.3.1
- Purchase Order Detail table (F4311), 5.4.1.2, 5.4.1.4
- Purchase Order Receipts program (P4312), 5.5.1.1
- Purchase Order Receiver table (F43121), 5.4.1.4
- purchase orders
-
- entering for project material, 5.4.3
- entering information using the Project Workbench program, 5.4.4
- purchase orders for project material
-
- entering, 5.4.3, 5.4.4
- Purchase Orders program (P4310), 5.4.1, 5.4.3
Q
- Quantity Type (34/QT), 3.3
- Quantity Type UDC (34/QT), 5.3.4
- quote and proposal generation process, 4.5.1
- quotes
-
- creating for a project, 4.5.5
R
- R00932 program, 5.5.1.2
- R09801 program, 5.5.1.2
- R30601 program, 5.3.1.1
- R31410 program, 4.3.2.1, 4.3.7.2
- R31430 program, 6.1.2.2
- R3190 program, 6.1.2.1
- R31P301 program, 6.1.2, 6.2.1
- R31P400 report
-
- processing options, 6.3.3
- usage, 6.3.2
- R31P401 report
-
- processing options, 6.3.5
- usage, 6.3.4
- R31P402 report
-
- processing options, 6.3.7
- usage, 6.3.6
- R31P403 program
-
- processing options, 6.4.3
- usage, 6.4.2
- R31P404 program
-
- processing options, 3.6.2
- usage, 3.6.3
- R31P405 program, 5.4.8
- R31P800 program
-
- processing options, 5.2.2
- usage, 5.2.1
- R31P801 program
-
- processing options, 3.6.2
- usage, 3.6.4
- R31P993 program
-
- processing options, 5.5.4
- usage, 5.5.1.2, 5.5.5
- R3482 program, 5.1
- R3483 program, 5.3.1.4, 5.3.4
- R40910 report, 5.5.1.2
- R4317 program, 5.5.1.2
- related costs
-
- updating, 5.4.1.4
- related order costs
-
- updating, 5.4.8
- Related Order Cross Reference table (F4080), 5.4.1.2
- Related Order Cross Reference Table (F4080), 2.4
- related orders for a project
-
- creating, 5.4.6
- reviewing, 5.4.6
- Related Orders program (P31P204)
-
- processing options, 5.4.5
- usage, 5.4.1.2
- Repost Open Work Orders program (R3190), 6.1.2.1
- Resource Assignment Level (48/RL), 3.3
- resource assignments, 4.3.2.2
- Resource Assignments program (P48331), 4.3.2.2
- Revise Account Numbers form, 3.4.2, 3.4.5
- Revise Cost Types form, 3.4.2, 3.4.4
- Rollup of Actual Costs to Workbench program (R31P301), 6.1.2, 6.2.1
S
- Sales Order Detail table (F4211), 5.4.1.2
- Scheduling Error Report table (F31PUI01), 2.4
- Search for Projects form, 4.2.2, 4.3.3
- setup overview, 3.1
- Stocking Type Code (41/I), 3.3
- storing project information
-
- technical considerations, 4.2.1.1
- Structure Revisions program (P0150), 4.5.2
- Summary Availability program (P41202), 5.5.1.1
- supply and demand
-
- reviewing for multiplant project requirements planning, 5.3.6
- supply and demand for multiplant project requirements planning
-
- reviewing, 5.3.6
- Supply and Demand Inquiry program (P4021), 5.3.1.3
- system features
-
- overview, 2.3
- project alerts, 2.3
- project costing and budgeting, 2.3
- project materials plans, 2.3
- project proposals, 2.3
- project quotes, 2.3
- project schedules and reports, 2.3
T
- task assignments, 4.3.2.2
- task dependencies
-
- defining, 4.4.1, 4.4.4
- Task Dependencies table (F31P12), 2.4
- Task Dependency Type (31P/DT), 3.3
- task types, 3.1.1, 4.4.1
- tasks
-
- scheduling, 4.4.5
- technical considerations for storing project information, 4.2.1.1
U
- UDCsuser-defined codes, 3.3
- Update Related Costs program (R31P405), 5.4.1.4, 5.4.8
- Upload Job Cost Budgets program (R31P800)
-
- processing options, 5.2.2
- usage, 5.2.1
- user-defined codes, 3.3
V
- View All Tasks form, 4.3.3
W
- Work Order Completions program (P31114), 3.6.4, 6.1.2.1
- Work Order ETO Tag File table (F4801T1), 2.4
- Work Order Master table (F4801), 4.2.1, 4.3.2
- Work Order Master Tag table (F4801T), 4.3.2.1, 5.5.1.2, 6.2.1
- Work Order Parts List program (P3111), 4.3.7.2, 5.4.4
- Work Order Parts List program (P31P201), 5.4.1
- Work Order Parts List table (F3111), 6.3.4
- Work Order Routing Instructions program (P3112), 4.3.7.2
- Work Order Time Entry program (P311221), 4.3.2.1
- work orders
-
- attaching existing to a project, 5.4.1.3, 5.4.7
- completing for a project, 6.1.2.1
- issuing for a project, 6.1.2.1
- reviewing inventory commitments for projects, 5.5.3
- Work with Account Numbers form, 3.4.2
- Work with Cost Types form, 3.4.2
- Work With Detail Messages form, 5.3.3
- Work With Order Headers form, 5.4.2
- Work With Project Commitment Detail form, 5.5.2, 5.5.3
- Work With Project Quote form, 4.5.3
- Work with Projects form, 3.5.3
- Work with Related Orders form, 5.4.2
- Work with Supply and Demand form, 5.3.3, 5.3.6
- Work With Work Order Parts List form, 5.4.2