Project Definition
Purpose
Plan and prepare the work to be performed.
Main Tasks
The main tasks are:
Asset Generation
This step moves all of the program components, production JCL and the data located in the source production environment to the source test environment.
Purpose
Freeze and isolate the asset in a source test environment.
Main Tasks
The main tasks to be conducted are as follow:
Execute and validate the source delivery process from the source test environment to the target environment.
Asset Cataloging
Purpose
Main Tasks
The main tasks to be conducted are as follow:
Asset Rationalization (Conditional Step)
This process is only necessary when the asset cataloging has found too many errors.
Purpose
Main Tasks
The main tasks to be conducted are as follow:
Target External Specifications
Purpose
Provide the following detailed external specifications:
Main Tasks
The principal external specification tasks are:
Define the external specifications of each target technical feature: hardware and software configuration, overall technical architecture and architecture implementation.
Architecture Development
Purpose
To set up and validate the target technical architecture, Oracle database, UNIX OS, Tuxedo and customer specific features.
Main Tasks
Provide the following detailed external specifications:
Define target specifications of the technical components of the TP and batch architectures.
Install the target standard architecture.
Data Conversion
Three steps compose the global data conversion process:
Purpose
Data Discovery and Downloading
Data Remodeling and Reloading
Transfer the source data system to the target system.
Data Validation
Main Tasks
The main tasks include:
Data Discovery and Downloading
Data Remodeling and Reloading
Reload target data.
Data Validation
Execute programs within both source and target environment.
Pilot Conversion
Purpose
Implement and validate the target technical environment
Main Tasks
The principal tasks to achieve are:
Setup the target architecture software environment including Oracle database.
Balance Conversion
Purpose
Implement the conversion process for the balance of assets remaining after the pilot conversion using the conversion rules and validated processing used for the pilot set with the same precision and iterative specifications.
Main Tasks
Operations Environment Migration
Purpose
To redefine the production means and procedures for the target environment from the ones that are available in the source environment and in line with the requirements.
Main Tasks
The relevant tasks are divided as follows:
Define detailed specifications regarding each target operations component and identify constraints.
System Integration
Purpose
Main Tasks
Maintenance Conversion
Purpose
Convert all changes (addition, modifications, and deletions) which occurred between two images of the same asset (total or subset) with the following constraints:
Main Tasks
Production Switch-over
Purpose
Uninterrupted switch over from the source to the target system, complying with the constraints (the size of the switch-over time window specifically).
Main Tasks
The main tasks to achieve are:
Develop a source to target data transfer procedure compatible with the delivery time constraints.