C H A P T E R  6

Finishing Up Servicing

This chapter describes how to finish up servicing the server.

The following topics are covered:


6.1 Final Service Procedures

This section provides the finishing tasks in servicing your server.

6.1.1 Replacing the Top Cover

1. Place the top cover on the chassis.

Set the cover down so that the cover hangs over the rear of the server by about an inch (2.5 cm).

2. Slide the cover forward until it latches into place.

6.1.2 Reinstalling the Server Chassis in the Rack

1. Refer to the Sun SPARC Enterprise T1000 Server Installation Guide for installation instructions.

2. After you have reinstalled the server chassis in the rack, reconnect all cables that you disconnected when you removed the chassis from the rack.

6.1.3 Applying Power to the Server



Note - If you have just disconnected the power cord from the power supply, you must wait about five seconds before reconnecting the power cord to the power supply.



single-step bulletReconnect the power cord to the power supply.



Note - As soon as the power cord is connected, standby power is applied. Depending on the configuration of the firmware, the system might boot.