Sun Management Center 4.0 Release Notes

One Hour Data Is Not Plotted in the Graph for Custom Time Selection (6619000)

The Performance Reporting Manager graphs can be generated for a user specified time range. In the Sun MC 4.0 release Performance Reporting Manager graphs, if the lower bound of the range and the time at which the data was generated are the same, the point is not displayed.

Workaround: Include an additional interval of half an hour or one hour at the lower bound.

For example, if there is hourly data for a certain property starting at 5.30, 6.30 and so on till 11.30, and if the graph is requested for the range between 6.30 and 10.30, the graph does not include the data point at 6.30. However, if the range is between 6.00 and 10.00, all the points are correctly plotted.