Solaris 10 Installation Guide: Solaris Live Upgrade and Upgrade Planning

Canceling a Scheduled Create, Upgrade, or Copy Job

A boot environment's scheduled creation, upgrade, or copy job can be canceled just prior to the time the job starts. A job can be scheduled for a specific time either in the GUI with the Create a Boot Environment, Upgrade a Boot Environment, or Copy a Boot Environment menus. In the CLI, the job can be scheduled by the lumake command. At any time, only one job can be scheduled on a system.

ProcedureTo Cancel a Scheduled Create, Upgrade, or Copy Job (Character User Interface)

Steps
  1. From the main menu, select Cancel.

  2. To view a list of boot environments that is available for canceling, press F2.

  3. Select the boot environment to cancel.

    The job no longer executes at the time specified.

ProcedureTo Cancel a Scheduled Create, Upgrade, or Copy Job (Command-Line Interface)

Steps
  1. Become superuser or assume an equivalent role.

    Roles contain authorizations and privileged commands. For more information about roles, see Configuring RBAC (Task Map) in System Administration Guide: Security Services.

  2. Type:


    # lucancel
    

    The job no longer executes at the time that is specified.