Solaris 10 11/06 Installation Guide: Solaris Live Upgrade and Upgrade Planning

Canceling a Scheduled Create, Upgrade, or Copy Job

A boot environment's scheduled creation, upgrade, or copy job can be canceled just prior to the time the job starts. A job can be scheduled for a specific time either in the GUI with the Create a Boot Environment, Upgrade a Boot Environment, or Copy a Boot Environment menus. In the CLI, the job can be scheduled by the lumake command. At any time, only one job can be scheduled on a system.

ProcedureTo Cancel a Scheduled Create, Upgrade, or Copy Job (Character User Interface)

  1. From the main menu, select Cancel.

  2. To view a list of boot environments that is available for canceling, press F2.

  3. Select the boot environment to cancel.

    The job no longer executes at the time specified.

ProcedureTo Cancel a Scheduled Create, Upgrade, or Copy Job (Command-Line Interface)

  1. Become superuser or assume an equivalent role.

    Roles contain authorizations and privileged commands. For more information about roles, see Configuring RBAC (Task Map) in System Administration Guide: Security Services.

  2. Type:


    # lucancel
    

    The job no longer executes at the time that is specified.