Solaris Live Upgrade 2.0 Guide

Canceling a Scheduled Create, Upgrade, or Copy Job

A boot environment's scheduled creation, upgrade, or copy job can be canceled up to the time the job starts. A job can be scheduled for a specific time in the GUI with the Create a Boot Environment, Upgrade a Boot Environment, or Copy a Boot Environment menus. In the CLI, the job can be scheduled by the lumake(1M) command. There can be only one job scheduled at a time on a system.

To Cancel a Scheduled Create, Upgrade, or Copy Job (Character Interface)

  1. From the main menu, select Cancel.

  2. To view a list of boot environments available for canceling, press F2.

  3. Select the boot environment to cancel.

    The job no longer executes at the time specified.

To Cancel a Scheduled Create, Upgrade, or Copy Job (Command-Line Interface)

  1. Log in as superuser.

  2. Type:


    # lucancel
    

    The job no longer executes at the time that is specified.