Exit Print View

Sun Datacenter InfiniBand Switch 72 User’s Guide

Get PDF Book Print View
 

Document Information

Using This Documentation

Related Documentation

Documentation, Support, and Training

Documentation Feedback

Installing the Switch

Understanding Switch Specifications

Routing Service Cables

Understanding InfiniBand Cabling

Understanding the Installation

Shipping Carton Contents

Install the Switch in the Rack

Powering On the Switch

Connecting InfiniBand Cables

Attach the InfiniBand Cables

Check Link Status

Verifying the InfiniBand Fabric

Administering the Switch

Troubleshooting the Switch

Administrative Command Overview

Monitoring the Hardware

Monitoring the InfiniBand Fabric

Controlling the Hardware

Controlling the InfiniBand Fabric

Servicing the Switch

Understanding Service Procedures

Servicing the Power Supplies

Servicing the Fans

Servicing the InfiniBand Cables

Servicing the Battery

Upgrading the Firmware

Index

Check Link Status

  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this procedure.

    See Installation Sequence.

  2. On the management controller, determine the state of the links:

    # listlinkup
    • If the link for a connector is reported as Not present, there is no cable attached or the link at either end of the cable is down.

    • If a port is down, use the enableswitchport command to bring the port up. Alternatively, use the i4reset command to reset the entire switch chip. See Enable a Switch Chip Port and Reset the Switch Chip.

  3. Verify the InfiniBand fabric.

    See Verifying the InfiniBand Fabric.

Related Information