1. Preparing to Install the Rack
Installing the Rack Task Overview
Observing Safety Guidelines and Warnings
Electrostatic Discharge Prevention
Preparing the Installation Site
Mounting Holes and Cable Routing Floor Cutout
Leveling Feet and Castor Dimensions
Cable Routing Space Dimensions
Sun Rack II 1042 Rear Cabling Space
Sun Rack II 1242 Rear Cabling Space
Differences Between Standard and Enterprise Packaging
Moving the Rack to the Installation Site
Move the Rack to the Installation Site
Stabilize the Rack With the Mounting Brackets
Stabilize the Rack With the Leveling Feet
Attaching an Optional Ground Cable
3. Installing Equipment Into the Rack
Installing Equipment Task Overview
Observing Equipment Installation Guidelines
Preparing to Install Equipment Into the Rack
Preparing Factory-Installed Power Distribution Units
Installing Power Distribution Units
Insert Cage Nuts Into Rail Holes
Using the Cable Management Hooks
Installing Equipment Into the Rack
Installing Optional Components
Install Third-Party Cable Trays
Servicing Equipment in the Rack
Observing Equipment Service Guidelines
Servicing Power Distribution Units
Locating and Disconnecting Panel Grounding Straps
Removing and Replacing the Doors
Removing and Replacing the Side Panels
Removing and Replacing Filler Panels
Removing and Replacing the Top Panel
5. Repacking a Rack for Shipment
Repacking the Rack in the Enterprise Packaging
Tools Required
Insert Cage Nuts Into Rail Holes
Remove the Side Panels
Install Third-Party Cable Trays
Replace the Top Panel
Removing and Replacing the Top Panel
Replace the Top Panel