Sun Rack II

User’s Guide

search filter icon
search icon

Document Information

Using this Documentation

1.  Preparing to Install the Rack

Installing the Rack Task Overview

Observing Safety Guidelines and Warnings

Verifying Requirements

Size and Space Requirements

Packaging Dimensions

Sun Rack II 1042 Dimensions

Sun Rack II 1242 Dimensions

Access Route Guidelines

Power Requirements

Grounding Requirements

Airflow Requirements

Electrostatic Discharge Prevention

Preparing the Installation Site

Mounting Holes and Cable Routing Floor Cutout

Leveling Feet and Castor Dimensions

Cable Routing Space Dimensions

Sun Rack II 1042 Rear Cabling Space

Sun Rack II 1242 Rear Cabling Space

Top Cable Window Dimensions

2.  Installing the Rack

Unpacking the Rack

Differences Between Standard and Enterprise Packaging

Tools Required

Moving the Rack to the Installation Site

Move the Rack to the Installation Site

Stabilizing the Rack

Stabilize the Rack With the Mounting Brackets

Stabilize the Rack With the Leveling Feet

Attaching an Optional Ground Cable

Attach a Ground Cable

3.  Installing Equipment Into the Rack

Installing Equipment Task Overview

Observing Equipment Installation Guidelines

Preparing to Install Equipment Into the Rack

Using the Anti-Tilt Legs

Taking Antistatic Precautions

Adjusting the RETMA Rails

Preparing Factory-Installed Power Distribution Units

Installing Power Distribution Units

Insert Cage Nuts Into Rail Holes

Using the Cable Management Hooks

Installing Equipment Into the Rack

Installing Optional Components

Install Filler Panels

Install Third-Party Cable Trays

4.  Servicing the Rack

Servicing Equipment in the Rack

Observing Equipment Service Guidelines

Servicing Power Distribution Units

Powering the Rack Off and On

Power the Rack Off

Power the Rack On

Locating and Disconnecting Panel Grounding Straps

Disconnect a Grounding Strap

Removing and Replacing the Doors

Remove the Doors

Replace the Doors

Removing and Replacing the Side Panels

Remove the Side Panels

Replace the Side Panels

Removing and Replacing Filler Panels

Remove Filler Panels

Replace Filler Panels

Removing and Replacing the Top Panel

Remove the Top Panel

Replace the Top Panel

5.  Repacking a Rack for Shipment

Securing the PDUs in the Rack

Secure the PDUs in the Rack

Repacking the Rack in the Enterprise Packaging

Repack the Rack in the Enterprise Packaging

Index

Preparing the Installation Site

It is your responsibility to prepare the site prior to installing the rack. If available, refer to the site planning guide for any server or equipment you plan to install in the rack for additional site preparation requirements.

Prior to installing the rack, perform the following tasks:

  1. Thoroughly clean and vacuum the area in preparation of the installation.

  2. Note any problems or peculiarities at the site that require special equipment.

  3. Verify that the installation site flooring has a high enough strength rating to withstand the combined weight of the rack and any installed equipment.

  4. Install all necessary electrical equipment and ensure that sufficient power is provided.

    Refer to the Sun Rack II Power Distribution Units User’s Guide for the power requirements of the Sun Rack II power distribution units.

  5. Ensure that the installation site provides adequate air conditioning.

  6. Operate the air conditioning system for 48 hours to bring the room to the appropriate temperature.

Mounting Holes and Cable Routing Floor Cutout

You can permanently mount the rack to the installation site floor using the same mounting brackets that secured the rack to the shipping pallet. If you plan on stabilizing the rack using these mounting brackets, prepare the installation site by drilling four holes into the floor. See Bottom View of Sun Rack II 1042 Showing Mounting Hole and Floor Cutout Dimensions for the Sun Rack II 1042 hole spacing locations and Bottom View of Sun Rack II 1242 Showing Mounting Hole and Floor Cutout Dimensions for the Sun Rack II 1242 hole spacing locations.

If you will route data or PDU power cords down through the bottom of the rack, you need to cut out a hole in your installation site’s floor. Cut out a rectangular hole below the rear portion of the rack, safely between the two rear casters and behind the rear RETMA rails. See Bottom View of Sun Rack II 1042 Showing Feet and Castor Dimensions and Bottom View of Sun Rack II 1242 Showing Feet and Castor Dimensions for the location and dimensions of this floor cutout.


Note - The Sun Rack II cabinet is secured to its heavy-duty shipping pallet with six mounting brackets. Use only four brackets (two front and two rear) to stabilize the rack securely to the installation site floor. See Stabilize the Rack With the Mounting Brackets for the mounting instructions.



Caution

Caution - Avoid creating a hole where the rack’s castors or leveling feet brackets will be. See Leveling Feet and Castor Dimensions for the location of these parts.


Figure 1-3 Bottom View of Sun Rack II 1042 Showing Mounting Hole and Floor Cutout Dimensions

image:Figure showing the Sun Rack II 1042 mounting hole dimensions and optional floor cutout.

Figure Legend

1 site preparationmounting holesdimensions, 1042Distance from mounting bracket to the edge of the rack – 113 mm / 4.45 in.

2 dimensionsfloormounting bracket holes, 1042Width between the centers of the mounting hole slots – 374 mm / 14.72 in.

3 dimensionsfloorcutout, 1042Distance between mounting bracket to the edge of the rack – 113 mm / 4.45 in.

4 site preparationfloor cutoutdimensions, 1042Distance between the centers of the front and rear mounting hole slots – 981.5 mm / 38.64 in.

5 cablingfloor cutout1042 dimensionsDepth of cable-routing floor cutout – 185.0 mm / 7.25 in.

6 Distance between the floor cutout and the edge of the rack – 160 mm / 6.30 in.

7 stabilizingmounting bracketsholes, 1042Width of cable-routing floor cutout – 280.0 mm / 11.00 in.


Note - The distance between the front edge of the front mounting bracket to the rear edge of the rear mounting bracket is 1015.5 mm (39.98 in.).


Figure 1-4 Bottom View of Sun Rack II 1242 Showing Mounting Hole and Floor Cutout Dimensions

image:Figure showing the Sun Rack II 1242 mounting hole dimensions and optional floor cutout.

Figure Legend

1 site preparationmounting holesdimensions, 1242Distance from mounting bracket to the edge of the rack – 113 mm / 4.45 in.

2 dimensionsfloormounting bracket holes, 1240Width between the centers of the mounting hole slots – 374 mm / 14.72 in.

3 dimensionsfloorcutout, 1240Distance between mounting bracket to the edge of the rack – 113 mm / 4.45 in.

4 site preparationfloor cutoutdimensions, 1240Distance between the centers of the front and rear mounting hole slots – 1120 mm / 44.1 in.

5 cablingfloor cutout1240 dimensionsDepth of cable-routing floor cutout – 330 mm / 13 in.

6 Distance between the floor cutout and the edge of the rack – 160 mm / 6.3 in.

7 stabilizingmounting bracketsholes, 1240Width of cable-routing floor cutout – 280.0 mm / 11 in.


Note - The distance between the front edge of the front mounting bracket to the rear edge of the rear mounting bracket is 1154.0 mm (43.43 in.).


Leveling Feet and Castor Dimensions

The following figure shows the dimensions of the Sun Rack II leveling feet and castors. In the figure, the datum point symbols image:datum point icon denote the centers of the castors.

Figure 1-5 Bottom View of Sun Rack II 1042 Showing Feet and Castor Dimensions

image:Figure showing the Sun Rack II 1042 leveling feet and castors dimensions.

Figure Legend

1 Distance from the edge of the mounting feet to the side of the rack – 33.75 mm / 1.33 in.

2 Width from the outside edges of the leveling feet – 532.5 mm / 20.96 in.

3 Width from the inside edges of the leveling feet – 429 mm / 16.89 in.

4 Distance from the edge of the feet to the front rack surface – 73.75 mm / 2.90 in.

5 Depth of the outside edges of the leveling feet – 918.5 mm / 36.16 in.

6 Distance from the edge of the leveling feet to the rear rack surface – 33.75 mm / 1.33 in.

7 Distance from the center of front castors to the side of the rack – 86.7 mm / 3.41 in.

8 Width between the center of the front castors – 426.6 mm / 16.80 in.

9 Distance from the center of the rear castors to the rear of the rack – 173.7 mm / 6.84 in.

10 Depth between the front and rear castors – 689.9 mm / 27.16 in.

11 Distance between the rear castors and the rear of the rack – 162.4 mm / 6.39 in.

12 Distance from the center of rear castors to the side of the rack – 96.4 mm / 3.80 in.

13 Width between the center of the rear castors – 407.2 mm / 16.03 in.

Figure 1-6 Bottom View of Sun Rack II 1242 Showing Feet and Castor Dimensions

image:Figure showing the Sun Rack II 1242 leveling feet and castors dimensions.

Figure Legend

1 Distance from the edge of the mounting feet to the side of the rack – 33.75 mm / 1.33 in.

2 Width from the outside edges of the leveling feet – 532.5 mm / 20.96 in.

3 Width from the inside edges of the leveling feet – 429 mm / 16.89 in.

4 Distance from the edge of the feet to the front rack surface – 73.75 mm / 2.90 in.

5 Depth of the outside edges of the leveling feet – 1058.5 mm / 41.67 in.

6 Distance from the edge of the leveling feet to the rear rack surface – 33.75 mm / 1.33 in.

7 Distance from the center of front castors to the side of the rack – 86.7 mm / 3.41 in.

8 Width between the center of the front castors – 426.6 mm / 16.80 in.

9 Distance from the center of the rear castors to the rear of the rack – 173.7 mm / 6.83 in.

10 Depth between the front and rear castors – 828.6 mm / 32.62 in.

11 Distance between the rear castors and the rear of the rack – 162.4 mm / 6.39 in.

12 Distance from the center of rear castors to the side of the rack – 96.4 mm / 3.80 in.

13 Width between the center of the rear castors – 407.2 mm / 16.03 in.