Go to main content
1/29
Contents
List of Figures
Title and Copyright Information
Preface
Audience
Documentation Accessibility
Related Documents
Conventions
1
Overview to Product Data Management - Process
1.1
System Integration
1.2
Features
1.3
System Concepts
1.3.1
Enterprise Requirements Planning and Execution (ERPx) Review
1.4
Menu Overview
1.4.1
Fast Path Commands
Part I Item Entry
2
Overview to Item Entry
2.1
Objectives
2.2
About Item Entry
2.3
Before You Begin
3
Enter Item Master Information
3.1
Entering Item Master Information
3.1.1
What You Should Know About
3.2
Entering Basic Item Information
3.2.1
What You Should Know About
3.3
Entering Item Text
3.3.1
Before You Begin
3.4
Assigning Item Responsibility
3.5
Entering Item Classification Codes
3.6
Entering Item Unit of Measure Information
3.7
Entering Item Manufacturing Information
3.8
Entering Item Grade and Potency Information
3.8.1
What You Should Know About
3.8.2
Processing Options
4
Enter Branch/Plant Information
4.1
Entering Branch/Plant Information
4.1.1
What You Should Know About
4.2
Assigning an Item to a Branch/Plant
4.3
Working with Item Locations
4.3.1
What You Should Know About
4.4
Entering Item Branch/Plant Manufacturing Information
4.4.1
What You Should Know About
4.4.2
Processing Options
Part II Process Manufacturing
5
Overview to Process Manufacturing
5.1
Objectives
5.2
About Process Manufacturing
5.3
About Work Centers
5.3.1
Features
5.3.2
Work Center System Integration
5.3.3
Work Center Arrangement
5.4
About Processes
5.4.1
Co-Products
5.4.2
By-Products
5.4.3
Ingredients
5.4.4
Intermediates
5.4.5
Process Routings
5.4.6
Substitutes
5.4.7
Alternate Operations
5.4.8
Batch Processes
5.4.9
Percent Processes
5.5
About Lead Times
5.6
Tables
5.6.1
Training Class Case Study
6
Set Up Process Manufacturing
6.1
Setting Up Manufacturing Constants
6.2
Setting Up Bill of Material Types
6.3
Setting Up Time Basis Codes
6.4
Setting Up Standard Procedure Descriptions
6.5
Setting Up a Shop Floor Calendar
6.5.1
What You Should Know About
6.5.2
Generating Shop Floor Calendar
6.5.3
Processing Options
6.6
Setting Up a Make/Buy Table
6.6.1
What You Should Know About
6.7
Setting Up Routing Types
6.8
Setting Up Kanbans
6.8.1
Generating Kanbans
6.8.2
Processing Options
7
Work with Work Centers
7.1
Working with Work Centers
7.1.1
Before You Begin
7.2
Entering Work Centers
7.3
Entering Costing and Accounting Information
7.4
Reviewing Operations by Work Center
8
Work With Processes
8.1
Enter Processes
8.1.1
What You Should Know About
8.2
Working With Operations
8.3
Working With Ingredients
8.3.1
To enter a substitute ingredient
8.3.2
What You Should Know About
8.3.3
What You Should Know About
8.4
Entering Production Information
8.5
Entering Co-/By-Products
8.6
Entering Intermediates
8.6.1
Batch Bills
8.6.2
Processing Options
8.7
Working With Text
8.8
Updating Component Scrap
8.9
Changing Multiple Processes
8.9.1
Before You Begin
8.9.2
What You Should Know About
8.9.3
Processing Options
8.9.4
Where Used Update Report
8.10
Verifying Processes
8.10.1
What You Should Know About
8.10.2
Integrity Analysis Report With Errors
8.10.3
Integrity Analysis Report Without Errors
9
Review Processes
9.1
Locating Processes
9.1.1
Processing Options
9.1.2
Processing Options
9.1.3
Processing Options
9.1.4
Processing Options
9.1.5
Comparing Processes
9.1.6
Processing Options
9.2
Printing Process Information
9.2.1
Single Level Ingredient Report
9.2.2
Processing Options
9.2.3
Multi-Level Ingredient Report
9.2.4
Processing Options
9.2.5
Ingredient Where Used Report
9.2.6
Processing Options
9.2.7
Ingredient Comparison Report
9.2.8
Processing Options
9.2.9
Process Report
9.2.10
Instructions Report
10
Work With Lead Times
10.1
Reviewing Lead Times
10.1.1
What You Should Know About
10.1.2
Processing Options
10.2
Generating Lead Times
10.2.1
Processing Options
Part III Engineering Change Management
11
Overview to Engineering Change Management
11.1
Objectives
11.2
About Engineering Change Management
11.2.1
What Is an ECO (Engineering Change Order)?
11.2.2
Features
11.2.3
System Integration
11.2.4
Who Is Involved in the ECO Process?
11.2.5
What Kinds of Changes Can I Define?
11.3
About ECO Revision Levels
11.3.1
Tables
11.3.2
Before You Begin
12
Set Up Engineering Change Orders
12.1
Setting Up Engineering Change Order Codes
12.1.1
To set up priority codes
12.2
Setting Up Next Numbers for Engineering Change Orders
12.3
Setting Up Approval Routings
12.3.1
To set up approval routings
12.3.2
To set up an order-specific approval routing
12.3.3
What You Should Know About
13
Work With Engineering Change Orders
13.1
Locating Existing ECOs
13.1.1
Processing Options
13.2
Entering ECOs
13.2.1
What You Should Know About
13.3
Defining Routings for ECOs
13.4
Defining Changes
13.4.1
What You Should Know About
13.4.2
What You Should Know About
13.4.3
Processing Options
13.5
Reviewing Pending Orders
13.6
Defining Details for ECOs
13.6.1
Processing Options
13.7
Notifying ECO Reviewers
13.7.1
What You Should Know About
13.7.2
Processing Options
14
Review Engineering Change Orders
14.1
Locating ECO Information
14.1.1
Processing Options
14.1.2
Processing Options
14.1.3
Processing Options
14.2
Reviewing Future Bills of Material
14.2.1
Processing Options
14.3
Printing ECO Information
14.3.1
ECO Details Report
14.3.2
Processing Options
14.3.3
Open ECO Report
15
Approve Engineering Change Orders
15.1
Reviewing ECOs for Approval
15.1.1
What You Should Know About
15.1.2
Processing Options
15.2
Updating Bills of Material
15.2.1
Before You Begin
15.2.2
Example: Engineering Change Population Report
15.2.3
What You Should Know About
15.2.4
Processing Options
Part IV Processing Options
16
Item Entry Processing Options
16.1
Item Master Revisions (P4101)
16.2
Branch/Plant Item Information (P41026)
17
Process Manufacturing Processing Options
17.1
Routing Master Revisions (P3003)
17.2
Where Used BOM Update (P30520)
17.3
Bill of Material Inquiry (P30200)
17.4
Where Used Inquiry (P30201)
17.5
Co-/By-Products Produced by Process (P30201)
17.6
Co-/By-Product Where Produced Inquiry (P30200)
17.7
Bill of Material Comparison (P30204)
17.8
Single Level Bill of Material (P30410)
17.9
Multi-Level Bill of Material (P30415)
17.10
Material Where Used List (P30420)
17.11
Bill of Material Comparison Print (P30425)
17.12
Lead Time Inquiry (P30207)
17.13
Lead Time Generator (P30822)
17.14
Work Day Calendar (P00071)
17.15
Calendar Generation (P0007G)
18
Engineering Change Management Processing Options
18.1
ECO Workbench (P30225)
18.2
Parts List Detail (P3013)
18.3
ECO Maintenance (P48020)
18.4
Order Approval Notification (P48181)
18.5
ECO Revision Inquiry (P30135)
18.6
Approval Audit/Review (P48185)
18.7
Assignment Review (P30220)
18.8
Future Bill Inquiry (P30210)
18.9
ECO Work Order Print (P48020P)
18.10
ECO Approval (P4818)
18.11
ECO - Bill of Material Population (P30510)
A
Functional Servers
A.1
About Functional Servers
B
Lead Time Calculations
B.1
Understanding Lead Time Calculations
Index
Scripting on this page enhances content navigation, but does not change the content in any way.