Oracle Engineering Flows

This chapter covers the following topics:

Oracle Engineering Overview

Oracle Engineering enables users to control new item revisions and bill of material changes. Its prototype also enables an organization move toward concurrent engineering by integrating engineering prototype data with manufacturing data.

Oracle Engineering Attributes

This section provides information on the common prerequisites, profile options, and data setups required for executing the Oracle Engineering flows. Flow specific requirements are documented along with the flow in the subsequent sections.

Prerequisites

None.

Profile Options

The following profile option must be set:

Profile Option Name Profile Option Value
EDR: E-records and E-signatures Yes

Predefined Data

The following predefined data must be used:

Page Name Field Name Field Value
User User Name plmmgr
  Password welcome
Responsibility Responsibility Name Manufacturing and Distribution Manager

Setup Data

The following data must be set up:

Window Name Field Name Field Value
Organization Organization V1
Organization Hierarchy Organization Hierarchy M1

Change Bills of Material and Routing through Engineering Change Order

This flow creates item, bill, routing, and engineering change order to modify the bill and routing. This flow also implements the engineering change order and verifies the modification.

Attributes

This section provides information on prerequisites, profile options, and data setups required to execute the Change Bills of Material and Routing through Engineering Change Order flow.

Technical Name

BOM_And_Routing_Change_Via_ECO

Prerequisites

None.

Profile Options

Not.applicable.

Predefined Data

The following predefined data must be used:

Window Name Field Name Field Value Comments
Item Template Template Purchased Purchased item attributes must be enabled
Engineering Bills Of Materials Basis Item  
Engineering Bills Of Materials Supply Type Push  
Engineering Routings Department dept1  
Engineering Routings Department dept2  
Engineering Change Orders Type Prod Chg  
Revised Operations Dept Code API_Dep1 For adding operation
Revised Operations Dept Code dept1 For deleting operation
Revised Operations Dept Code dept2 For changing operation attributes

Setup Data

The following data must be set up:

Window Name Field Name Field Value Comments
Engineering Master Items Item ECOItem01  
Engineering Master Items Item ECOItem02  
Engineering Master Items Item ECOItem03  
Engineering Master Items Item ECOItem04  
Engineering Bills Of Materials Item ECOItem01  
Engineering Bills Of Materials Component ECOItem02  
Engineering Bills Of Materials Component ECOItem03  
Engineering Routings Item ECOItem01  
Engineering Change Orders ECO RTECO1  
Revised Items Item ECOItem01  
Revised Operations Component ECOItem04 For adding components
Revised Operations Component ECOItem02 For deleting components
Revised Operations Component ECOItem03 For changing components attributes

Mass Change of Bills of Materials through Engineering Change Order

This flow performs a mass modification in the bills of materials and generates an engineering change order. The mass modification is verified after the change order is implemented.

Attributes

This section provides information on prerequisites, profile options, and data setups required to execute the Mass Change of Bills of Materials through Engineering Change Order flow.

Technical Name

Create_Mass_Change

Prerequisites

None.

Profile Options

Not.applicable.

Predefined Data

The following predefined data must be used:

Window Name Field Name Field Value Comments
Item Template Template Purchased Purchased item attributes must be enabled
Engineering Bills Of Materials Basis Item  
Engineering Bills Of Materials Supply Type Push  
Mass Change Bills Type ADCO  
Engineering Change Orders Type ADCO  
Component Changes Action Add  
Component Changes Action Disable  
Component Changes Action Change  

Setup Data

The following data must be set up:

Window Name Field Name Field Value Comments
Engineering Master Items - Main Item MSItem01  
Engineering Master Items - Main Item MSItem02  
Engineering Master Items - Main Item MSItem03  
Engineering Master Items - Main Item MSItem04  
Engineering Master Items - Main Item MSItem05  
Engineering Master Items - Main Item MSItem06  
Engineering Bills Of Materials Item MSItem01  
Engineering Bills Of Materials Item MSItem02  
Engineering Bills Of Materials Item MSItem03  
Engineering Bills Of Materials Component MSItem04  
Engineering Bills Of Materials Component MSItem05  
Mass Change Bills Number MSCO01  
Mass Change Bills Type ADCO  
Mass Change Bills Items From MSItem01  
Mass Change Bills Items To MSItem03  
Component Changes Item MSItem06 For adding multiple components
Component Changes Item MSItem04 For deleting multiple components
Component Changes Item MSItem05 For changing multiple component attributes
Engineering Change Orders ECO MSCO01  

Transfer and Copy Items, Bills of Materials and Routings from Engineering to Production

This flow transfers and copies items, bills of materials and routings from engineering to production using an engineering change order. These operations can also be done without an engineering change order.

Attributes

This section provides information on prerequisites, profile options, and data setups required to execute the Transfer and Copy Items, Bills of Materials and Routings from Engineering to Production flow.

Technical Name

Transfer_Copy_ENG_To_MFG

Prerequisites

None.

Profile Options

Not.applicable.

Predefined Data

The following predefined data must be used:

Window Name Field Name Field Value Comments
Item template Template Purchased Purchased Item attributes must be enabled.
Engineering Change Orders Type Prod Chg  

Setup Data

The following data must be set up:

Window Name Field Name Field Value Comments
Engineering Master Items - Main Item ENGTC01  
Engineering Master Items - Main Item ENGTC02  
Engineering Master Items - Main Item ENGTC03  
Engineering Master Items - Main Item ENGTC04  
Master Items - Main Item ENGTC01 Transferred data
Master Items - Main Item ENGTC02MFG Copied data
Master Items - Main Item ENGTC03 Transferred data
Master Items - Main Item ENGTC04MFG Copied data
Engineering Bills Of Materials Item ENGTC01  
Engineering Bills Of Materials Item ENGTC02  
Engineering Bills Of Materials Item ENGTC03  
Engineering Bills Of Materials Item ENGTC04  
Bill Of Materials Item ENGTC01 Transferred data
Bill Of Materials Item ENGTC02MFG Copied data
Bill Of Materials Item ENGTC03 Transferred data
Bill Of Materials Item ENGTC04MFG Copied data
Engineering Routings Item ENGTC01  
Engineering Routings Item ENGTC02  
Engineering Routings Item ENGTC03  
Engineering Routings Item ENGTC04  
Routings Item ENGTC01 Transferred data
Routings Item ENGTC02MFG Copied data
Routings Item ENGTC03 Transferred data
Routings Item ENGTC04MFG Copied data
Engineering Change Orders ECO RTECO01  

Create Engineering Change Order with Approval Process

This flow creates an engineering change order, and associates an approval list and an approval process that uses E-records and E-signatures. This flow also verifies that the approval process and approval list are not mutually exclusive.

Attributes

This section provides information on prerequisites, profile options, and data setups required to execute the Create Engineering Change Order with Approval Process flow.

Technical Name

Create_ECO_With_Approval_Process

Prerequisites

None.

Profile Options

The following profile option must be set:

Profile Option Name Profile Option Value
EDR: E-records and E-signatures Yes

Predefined Data

The following predefined data must be used:

Window Name Field Name Field Value
Organizations Organization M1
Change Type Processes Priority Standard
Change Type Processes Process ERES Approval Process

Setup Data

The following data must be set up:

Window Name Field Name Field Value
Change Type Type Forte Type
Engineering Change Orders ECO FORTE01