The diagram shows the spine switch, leaf switch 1, and leaf switch 2. The two leaf switches are at the bottom of the diagram, with 7 connections between them. The spine switch is at the top right of the diagram, with 1 connection to each leaf switch. At the top left is a box representing the Oracle Big Data Appliance InfiniBand ports, which have 9 connections to each leaf switch.