JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle Switch ES1-24

Installation Guide

search filter icon
search icon

Document Information

Using This Documentation

Product Notes

Related Documentation

CLI Command Modes

Feedback

Support and Accessibility

Understanding the Installation

Installation Task Overview

Front Panel Components

Rear Panel Components

Confirming Specifications

Physical Specifications

Electrical Specifications

Environmental Specifications

Understanding Cabling

Understanding Management and Power Cabling

Management Connection Overview

NET MGT Port

SER MGT Port

Power Cord Specifications

Understanding Data Cabling

SFP+ Data Cable Overview

10GBASE-T Data Cable Overview

Data Cable Cautions

Data Cable Guidelines

Single-Switch Location Guidelines

Preparing for Installation

ESD Precautions

Tools Needed for Installation

Verify Switch Kit Contents

Verify Rack Rail Kit Contents

Assemble an SFP+ Data Cable

Route Cables

Installing the Switch

Assemble a Filler

Attach the Rails to the Switch

Attach Telco Adapters to the Rack Slides

Attach the Rack Slides to the Rack

Install the Switch Into the Rack

Attach Power Cords

Install the Air Duct and Front Support

Attach Data and Management Cables

Prepare the Front Support and Small Air Duct

Powering On the Switch

Power On the Switch

Oracle ILOM Overview

Verify the DHCP-Assigned IP Address and Host Name

Configure Network Management From the CLI (SER MGT)

Log Into the Oracle ILOM Web (NET MGT)

Log Into the Oracle ILOM CLI (NET MGT)

Log Into the Oracle ILOM CLI (SER MGT)

Glossary

Index

Attach the Rack Slides to the Rack


Note - The rack slides might have a telco adaptor attached, and so would look different than those in these illustrations. However, the procedure to attach the rack slides is the same.


  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this procedure.

    See Installation Task Overview.

  2. Gather these components.
    • Rack slide assembly (2)

    • CMA assembly

    • M6 cage nuts (12)

    • M6x14 mm Philips screws (10)

    See Verify Rack Rail Kit Contents.

  3. Install the cage nuts to the inside of the rack posts where the rack slide assemblies are to install.

    Note - On the hot aisle, install three cage nuts on each post. On the cold aisle, install two cage nuts on each post for telco racks, or three cage nuts on each post for any other rack



    image:Figure shows attaching the cage nut to the rack post.
  4. Orient a rack slide assembly with the rectangular hole at one end toward the cold aisle.

    The green tab is toward the hot aisle.


    image:Figure shows installing the rack slide assemblies.
  5. Using a No. 2 Philips screwdriver, secure the rack slide assembly to the rack with four M6x14 screws.
  6. Repeat Step 4 and Step 5 for the other rack slide assembly.
  7. Attach the CMA assembly to the hot aisle end of the rack slide assemblies with two M6x14 screws.
    image:Figure shows attaching the CMA to the rack slide assemblies.
  8. Install the switch into the rack.

    See Install the Switch Into the Rack.

Related Information