SP Cable Requirements

The server contains two redundant SPs. One of these SPs functions as the Active SP to manage the server, while the other one acts as a Standby SP that will assume the Active SP role in the event of an SP failure.


Note -  Either SP (SP0 or SP1) can take the Active SP role. You cannot assume that SP0 will take the Active SP role and that SP1 will take the Standby SP role.

Each SP contains two types of ports:

  • SER MGT 0 port – Connect a Category 5 or better serial cable from the SER MGT port 0 to a terminal device. During the initial server power on, use this serial connection to monitor the boot process and perform the initial Oracle ILOM configuration.

  • NET MGT 0 port – Connect a Category 6 or better cable from the 1-GbE NET MGT port 0 to your Ethernet network. After the initial server configuration, use this Ethernet connection to monitor and administer the server through the Oracle ILOM console.


Note -  The SPs and the SPARC M7-16 server SPPs contain other ports that are inaccessible and covered by port covers. Do not attempt to use these ports unless instructed to do so by an Oracle Service representative.