Site Checklists
Release 12.1
E54545-06
November 2015
Complete the following site summary to provide basic customer contact information and to evaluate the overall readiness of the site for installation.
Description | Site Information |
---|---|
Is the site prepared for installation?
A: Pass. All complete and ready for installation B: Conditional pass. Not ready, but all open issues are scheduled to be fixed F: Fail. Not ready, and some open issues are not scheduled to be fixed | |
Customer signature and date (optional) | |
Customer name | |
Customer address | |
Customer contact Name: Title: Email: Telephone: | |
Oracle installation service request number (if known) | |
Installation type: How many racks? Is this a new installation or is it an extension to an existing installation? | |
Open issues: What did not pass? When will the issue be resolved? | |
Comments: |
Complete the following checklists to ensure that the site is prepared for the installation of Zero Data Loss Recovery Appliance (Recovery Appliance):
Complete the following checklist to ensure that the system's component and multirack issues have been addressed. If you will use Oracle Secure Backup for tape backups, note that Recovery Appliance installation ends at the fiber card; it does not extend to the tape system.
For information about multirack cabling, see Zero Data Loss Recovery Appliance Owner's Guide.
System Components Checklist Items | Yes | No | NA | Comment |
---|---|---|---|---|
How many Recovery Appliance racks will be installed at the site? | — | — | — | |
Is the rack an extension of an existing Recovery Appliance system, and not a new installation?
For an extension to an existing system, see Zero Data Loss Recovery Appliance Owner's Guide for multirack cabling information. | ||||
If the new rack will connect to other Recovery Appliance racks, then did you order the Sun Datacenter InfiniBand Switch 36 spine switches and cables? | ||||
If more than three racks will be installed, then did you order the cable expansion kit? | ||||
Did you order the multirack cabling service? | ||||
Are all Recovery Appliance racks adjacent to each other? | ||||
If the connecting racks are not adjacent, then did you do the following tasks:
| ||||
Will you replace the Ethernet switch? If yes, then did you arrange for the replacement switch installation? | ||||
Did you order enough 10 GbE cables to connect the local protected database systems to Recovery Appliance?
Use two cables for each database system for redundancy. | ||||
If your data center does not have a 10 GbE infrastructure, then have you ordered an external switch that supports both 10 GbE (or 40 GbE) and 1 GbE? | ||||
Will additional equipment be installed in the rack? If yes, then describe the additions.
You may install two 1 GbE switches in the top of the rack (U41 and U42). |
Complete the following checklist to ensure that the data center room requirements are met for Recovery Appliance.
For information about space and flooring requirements, see Zero Data Loss Recovery Appliance Owner's Guide.
Data Center Room Checklist Items | Yes | No | NA | Comment |
---|---|---|---|---|
Have you allocated the Recovery Appliance rack location? | ||||
Is the allocated location vacant and ready for the new equipment? | ||||
Does the floor layout meet the equipment maintenance access requirements? | ||||
Is adequate space available for maintenance? | ||||
Have you chosen a cabinet stabilization method? | ||||
Does the data center have a raised floor? | ||||
Does the raised floor satisfy the weight load requirement for the new hardware? | ||||
Do the raised floor tiles provide sufficient cutout space for the power cord plugs to pass through to the subfloor? | ||||
Can the floor tiles be removed without permission to accommodate service? | ||||
Will the new hardware location require any nonstandard cable lengths? | ||||
Is the floor to ceiling height a minimum of 2.9 meters (9.6 feet)? |
Complete the following checklist to ensure that the data center environment requirements are met for the Recovery Appliance.
For information about temperature and humidity requirements, see Zero Data Loss Recovery Appliance Owner's Guide.
Data Center Environment Review Items | Yes | No | NA | Comment |
---|---|---|---|---|
Does the computer room air conditioning system meet temperature and humidity requirements? | ||||
Does the installation floor layout satisfy the ventilation requirements? | ||||
Can you position the equipment so that the exhaust air of one rack does not enter the air intake of another rack? | ||||
Is each perforated floor tile rated for air flow at 400 cubic feet per minute or greater? | ||||
Do the data center air conditioners provide sufficient front-to-back airflow? | ||||
Is the airflow adequate to prevent hot spots? | ||||
Can the data center continuously satisfy environmental requirements? | ||||
Can more perforated floor tiles be obtained if required? |
Complete the following checklist to ensure that the access route requirements are met.
For information about access route requirements, see Zero Data Loss Recovery Appliance Owner's Guide.
Access Route Review Items | Yes | No | NA | Comment |
---|---|---|---|---|
Have you checked the access route for clearances of the packaged equipment? | ||||
Do all the doors and entryways conform to the width and height requirements for transportation, including the width of the unpacked unit?
All doors and entryways must be at least 87 inches (221 cm) tall for packaged delivery. | ||||
Does the access route provide sufficient space for transporting the packaged devices? | ||||
Have you confirmed that the access route is free of any obstacles that would expose the rack components to shock? | ||||
Are all the surfaces acceptable for rolling the new unpacked and packed equipment? | ||||
Can the path from the receiving location to the designated data center area support the weight of the unpacked equipment? | ||||
Is the path across the raised floor rated for dynamic loads? |