Go to main content

Oracle® SuperCluster M8 and SuperCluster M7 Administration Guide

Exit Print View

Updated: June 2020
 
 

Power Off SuperCluster in an Emergency

If there is an emergency, such as earthquake or flood, an abnormal smell or smoke, or a threat to human safety, you must power off SuperCluster immediately.

  • Use one of these methods to power off SuperCluster M8 or SuperCluster M7 in an emergency.
    • Turn off power at the circuit breaker, or pull the emergency power-off switch in the computer room.
    • Turn off the site EPO switch.
    • Turn off the two PDUs in the rack.

    After the emergency, contact Oracle Support Services to restore power to the system.

Related Information