Contents

1. Preface

  • 1.1 Introduction
  • 1.2 Audience
  • 1.3 Documentation Accessibility
  • 1.4 Organization
  • 1.5 Abbreviations and Abbreviations
  • 1.6 Glossary of Icons
  • 2. The Homework

  • 2.1 Structure of Implementation Teams
  • 2.2 The Project Plan
  • 2.3 Methodology for Status Reports
  • 2.3.1 Support Status Report
  • 2.4 Components of the Project Plan
  • 2.4.1 Management Summary of the Project
  • 2.4.2 Project Plan for the Bank
  • 2.4.3 Implementation Team
  • 2.4.4 Project Monitoring
  • 2.4.5 Hardware Planning
  • 2.4.6 Hardware/Software Installation
  • 2.4.7 Client Workstation Requirements
  • 2.4.8 User Documentation
  • 2.4.9 Oracle FLEXCUBE User Training
  • 2.4.10 Security Management System and Controls
  • 2.4.11 Branch Database Design
  • 2.4.12 Static Data Input
  • 2.4.13 Oracle FLEXCUBE System Trial Run
  • 2.4.14 Contingency Plan
  • 2.4.15 Stationery
  • 2.4.16 Job stream formulation
  • 2.4.17 Pre-conversion trial run
  • 2.4.18 Financial conversion
  • 2.4.19 Parallel Run
  • 2.4.20 Index
  • 3. Audit Requirements

  • 3.1 Controls
  • 3.1.1 Controls during Software Installation
  • 3.1.2 Controls during database Set-Up
  • 3.1.3 Controls during System Trial Run
  • 3.1.4 Controls while making a change to the Code
  • 3.2 Project Documentation
  • 3.2.1 Management Documentation
  • 3.2.2 System Documentation
  • 3.2.3 Software Installation
  • 4. Database Design

  • 4.1 The Designers
  • 4.2 The Design Process
  • 4.3 Review of Products
  • 4.4 Review of Account and Ledger Structure
  • 4.5 Outlining Basic Core Parameters
  • 4.6 Gathering Customer Data
  • 4.7 Outlining Product Level Parameters
  • 4.8 Review of Advice, Reports and MIS Requirements
  • 4.8.1 User Profiles Including Access Rights, Transaction and Authorization Limits
  • 4.8.2 System Performance Parameters
  • 4.8.3 Other Activities
  • 4.8.4 Review of the Design
  • 5. Data Input

  • 5.1 Approach
  • 5.2 Methodology
  • 5.3 Core Parameters and Tables Input Sequence
  • 5.3.1 Core Parameters (Miscellaneous) Maintenance
  • 5.3.2 Bank/ Branch Parameters
  • 5.3.3 Accounting Period Maintenance (Bank/ Branch Parameter)
  • 5.3.4 Holiday Maintenance
  • 5.3.5 System Date Maintenance (Bank/Branch Parameter)
  • 5.3.6 Customer Maintenance
  • 5.3.7 Other Bank/Branch Parameters
  • 5.3.8 Revaluation
  • 5.3.9 Limits
  • 5.3.10 Customer Accounts
  • 5.3.11 Front-End Module Product Set-up
  • 6. Database Callback

  • 6.1 Suggested List of Reports for Callback
  • 7. System Trial Run

  • 7.1 The Logistics
  • 7.1.1 The Database for Trial Run
  • 7.1.2 The Approach
  • 7.1.3 Components of the Trial Run
  • 7.1.4 Components of the Test Plan
  • 7.1.5 Handling Errors
  • 7.1.6 The Schedule
  • 7.1.7 Phase One
  • 7.1.8 Phase Two
  • 7.1.9 Phase Three
  • 8. Financial Conversion

  • 8.1 The Players
  • 8.2 Scope
  • 8.3 Planning
  • 8.3.1 How to do
  • 8.3.2 When to do
  • 8.3.3 Methodology
  • 8.3.4 Conversion Sequence
  • 8.3.5 Pre-conversion Checklist
  • 8.3.6 Standard Instructions for Conversion
  • 8.4 Conversion Procedure
  • 8.5 Sample Conversion Accounting Entries
  • 9. Parallel Run

  • 9.1 Callbacks
  • 9.1.1 Training
  • 9.1.2 Dummy Conversion/Parallel
  • 9.1.3 Summary
  • 10. Contingency Plan

  • 10.1 Operation Risk Assessment
  • 10.1.1 Brief Description of Location and Operations
  • 10.1.2 Major Causes of the Operational Risks
  • 10.2 Contingency Planning
  • 10.3 Software Errors Outside Normal working Hours
  • 10.3.1 Contingency Plan Distribution List
  • 10.3.2 People who can Authorize Emergency Measures
  • 10.3.3 Contact Points in Case of Hardware and Software Problems
  • 10.4 Potential for Exposure and Containment Measures
  • 10.4.1 Hardware Failure
  • 10.4.2 Containment Measures
  • 10.4.3 Disk Drive Failure
  • 10.4.4 Remote Branch Communications/Modem Failure
  • 10.4.5 Software Failure
  • 10.4.6 Utilities Failure
  • 11. Post Implementation Review

  • 11.1 Overview
  • 11.2 Post Implementation Review Guidelines
  • 11.2.1 System Environment
  • 11.2.2 System Administration Issues
  • 12. Implementation Sign-Off

  • 12.1 The Sign-Off Procedure