Enabling the Memory-based Planning Engine
Enable the Memory-based Planning Engine when defining multiple MRP, DRP, MPS, or MDS names.
The Memory-based Planning Engine is the default planning engine for MRP, DRP, and MPS names. If you define your plan or schedule without enabling a planning engine, the Memory-based Planning Engine will be enabled for you. The Standard Planning Engine is the default planning engine for MDS names.
To enable the Memory-based Planning Engine:
2. Enter an alphanumeric name that identifies a unique material requirements or distribution requirements plan.
3. Select Yes in the flexfield to enable the Memory-based Planning Engine, or No to enable the Standard Planning Engine.
To define a schedule name:
1. Navigate to the Master Demand Schedules or Master Production Schedules window.
3. Select Yes in the flexfield to enable the Memory-based Planning Engine, or No to enable the Standard Planning Engine.
See Also
Overview
Phases of the Planning Process
Processing Steps
Processes
Snapshot Tasks
Read Consistency
Interprocess Communication
Configuring the Memory-based Planning Engine
Parallel Processing