Previous | Next | Contents | Index | Glossary | Library |
Assembly, Job/Schedule, Line, Op seq | Sort by assembly, then by job or repetitive schedule within the assembly, then by line within the job or repetitive schedule, and then by operation sequence number within the line. |
Department, Assembly, Job/Schedule, Op seq | Sort by department number, then by assembly within the department, then by job or repetitive schedule within the assembly, and then by operation sequence number within the job or repetitive schedule. |
Job/Schedule, Assembly, Line, Op seq | Sort by job or repetitive schedule, then by assembly within the job or repetitive schedule, then by line within the assembly, and then by operation sequence number within the line. |
Line, Assembly, Job/Schedule, Op seq | Sort the report by line, then by assembly within the line, then by job or repetitive schedule within the assembly, and then by operation sequence number within the job or repetitive schedule. |
Previous | Next | Contents | Index | Glossary | Library |