Skip Headers
Oracle® Collaboration Suite High Availability Guide
10gRelease 1 (10.1.2) for Windows or UNIX

Part Number B25481-03
Go to Documentation Home
Home
Go to Book List
Book List
Go to Table of Contents
Contents
Go to Master Index
Master Index
Go to Feedback page
Contact Us

Go to previous page
Previous
View PDF

Index

A  C  F  H  M  N  O  P  R  S  V 

A

active-active, 1.2
active-passive, 1.2
adding or deleting nodes from Oracle Collaboration Suite Database
about, 3.1
bounce the Oracle Collaboration Suite Application tier processes, 3.1.3, 3.1.3
modify the connect string of the crawler, 3.1.2
modify the RAC database connect string in Oracle Internet Directory, 3.1.1

C

cluster agent, 1.2
clusterware, 1.2
configuration of load balancers, 2.4
configuring manual cold failover for Oracle Calendar Server, 3.3

F

failback, 1.2
failover, 1.2

H

hardware cluster, 1.2
high availability
about, 1.1.1

M

managing high availability environments, 3

N

network host name, 1.2

O

Oracle Collaboration Suite collocated identity management architecture, 2.2.2.2
Oracle Collaboration Suite distributed identity management architecture, 2.2.2.3
Oracle Collaboration Suite high availability
features, 1.3.1
framework, 1.3
Oracle Collaboration Suite Applications, 1.3.2.1
Oracle Collaboration Suite Infrastructure, 1.3.2.2
Oracle Collaboration Suite high availability architectures
about, 2.2
common requirements, 2.2.1
comparison, 2.3
Oracle Collaboration Suite collocated identity management architecture, 2.2.2.2
Oracle Collaboration Suite distributed identity management architecture, 2.2.2.3
Oracle Collaboration Suite single cluster architecture, 2.2.2.1
overview, 2.2.2
Oracle Collaboration Suite RAC enabled architecture
about, 2.1
outages in RAC, 2.1
Oracle Collaboration suite RAC enabled architecture
RAC configuration, 2.1
Oracle Collaboration Suite Single Cluster Architecture, 2.2.2.1
OracleAS cluster, 1.2
outage
planned, 1.1.2
unplanned, 1.1.2

P

physical host name, 1.2
primary node, 1.2

R

RAC, 2.1
redundant architectures
Oracle Collaboration Suite active-active configurations, 1.3.1.1
Oracle Collaboration Suite active-passive configurations, 1.3.1.1
removing nodes from Oracle Collaboration Suite Applications, 3.2.1

S

secondary node, 1.2
shared storage, 1.2
starting and stopping Oracle Collaboration Suite in a high availability environment
about, 3.4
starting Oracle Collaboration Suite, 3.4.2
stopping Oracle Collaboration Suite, 3.4.1
switchback, 1.2
switchover, 1.2

V

virtual host name, 1.2
virtual IP, 1.2