Bookshelf Home | Contents | Index | PDF |
Siebel Database Upgrade Guide for DB2 UDB for z/OS > Generating the Siebel Upgrade Files > Preparing and Executing the Non-Additive Schema and JCL Files on the z/OS Host > Transferring the Non-Additive Schema, Temp table, and Load and Unload files to the z/OS HostUse the following procedure to transfer the non-additive schema DDL files, the Temp table DDL files, and the Load and Unload control cards generated by the Upgrade Wizard on the midtier up to Pause #2 to the z/OS host. NOTE: Edit the generated files as required by Siebel Technical Notes, Siebel Alerts and Siebel Release Notes on My Oracle Support, or other publications before transferring them to the z/OS host. To transfer the files generated on the midtier
|
Siebel Database Upgrade Guide for DB2 UDB for z/OS | Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Legal Notices. | |