The following topics are covered:
Shutting Down the Affected Exalogic Machines and Exadata Database Machines
Handling Inter-Switch Cables
Extracting Spare InfiniBand Cables
Unbundling the Inter-Switch Cables
Applying Cable and Rack Labels
Connecting the Cables
Bundling the Cables
Inspecting the Cables
Verifying the Multirack Systems
Scripting on this page enhances content navigation, but does not change the content in any way.