Maintenance of Manufacturing Operations Center

Scheduling Process Flows

To avoid manually running process flows for incremental data collections, OWB allows them to be scheduled on the frequency required and set by users. To implement scheduling functionality for process flows:

  1. Create the Schedule module.

  2. Enter the name and description for Schedule Module Associate With a Location.

    This location should be a target location.

  3. Create a schedule.

  4. Specify the start time, end time, setup, and frequency.

  5. Right-click on process flow and click the Configure button.

  6. Select the created schedule in the Referred Calendar Field.

  7. In the control center, deploy the schedule.