Glossary

A
action message
Output of the planning process that identifies a type of action to be taken to correct a current or potential material, capacity, or transportation coverage problem.
aggregate resources
The summation of all requirements of multi-department resources across all departments that use them.
allocated ATP
The ability to allocate scarce supply (finished goods, key components or resources) to various demand channels. Whether you are performing ATP or CTP, the allocation is being considered for order promising.
alternate bill of material
An alternate list of component items you can use to produce an assembly.
alternate resources
Different resource or a group of different resources that can be used instead of the primary resource or group of resources in the job operation. Each resource, or group of resources, can form an alternate group. Alternative scheduling is when the primary group can be replaced by an alternate group in the job operation.
alternate routing
An alternate manufacturing process you can use to produce an assembly.
alternate unit of measure
All other units of measure defined for an item, excluding the primary unit of measure.
API
An Application Programming Interface (API) is a published interface to accomplish a business or scientific function. An API defines a contract to its users by guaranteeing a published interface but hides its implementation details.
assemble-to-order (ATO)
An environment where you open a final assembly order to assemble items that customers order. Assemble-to-order is also an item attribute that you can apply to standard, model, and option class items. An item you make in response to a customer order.
assembly
An item that has a bill of material. You can purchase or manufacture an assembly item. Seeassemble-to-order, bill of material.
assignment hierarchy
You can assign sourcing rules and bills of distribution to a single item in an inventory organization, all items in an inventory organization, categories of items in an inventory organization, a site, and an organization. These assignments have an order of precedence relative to one another.
assignment set
A group of sourcing rules and/or bills of distribution and a description of the items and/or organizations whose replenishment they control.
ATO
See assemble-to-order (ATO).
ATP
See available to promise (ATP).
availability
The quantity of the item is in stock (and not reserved) in the default location. Calculation is 'on-hand minus reserved.'
available capacity
The amount of capacity available for a resource or production line.
available to promise (ATP)
The quantity of current on-hand stock, outstanding receipts and planned production which has not been committed through a reservation or placing demand. In Oracle Inventory, you define the types of supply and demand that should be included in your ATP calculation. Refers to the ability to promise availability based on a pre-defined statement of current and planned supply.
available-to-promise rule
A set of Yes/No options for various entities that the user enters in Oracle Inventory. The combination of the various entities are used to define what is considered supply and demand when calculating available to promise quantity.
B
basic ATP
This term is used to describe the task of performing an ATP check against a given organization.
bill of distribution
Specifies a multilevel replenishment network of warehouses, distribution centers, and manufacturing plants.
bill of material
A list of component items associated with a parent item and information about how each item relates to the parent item. Oracle Manufacturing supports standard, model, option class, and planning bills. The item information on a bill depends on the item type and bill type. The most common type of bill is a standard bill of material. A standard bill of material lists the components associated with a product or subassembly. It specifies the required quantity for each component plus other information to control work in process, material planning, and other Oracle Manufacturing functions. Also known as product structures.
bill of resources
A list of each resource and/or production line required to build an assembly, model, or option.
bottleneck resource
A resource whose capacity is less than the demand placed upon it. For example, a bottleneck machine or work center exists where jobs are processed at a slower rate than they are demanded.
C
calculate ATP
An item attribute the planning process uses to decide when to calculate and print available to promise (ATP) for the item on the Planning Detail Report. The planning process calculates ATP as Planned production - committed demand.
calendar type
The period pattern used to define a manufacturing calendar.
capable to deliver
A calculation that includes the transit lead time to meet your customers delivery needs Oracle Global Order Promising encompasses all these capabilities.
capable to promise
CTP (Capable to Promise) refers to the additional ability to determine the availability of component materials and resources to meet unplanned demands.
component
A serviceable item that is a part or feature in another serviceable item. Your customers cannot report service requests against this type of serviceable item directly. You can reference components when you enter service requests against actual end item-type serviceable items, or products. For example, if you define three inventory items, A, B, and C, where A and B are products (end item-type serviceable items) but C is a component (non-end item-type serviceable item) of A, you can enter service requests against A and B directly, but not against C. When you enter a service request against product A, you can reference C because it is a component of A.
component demand
Demand passed down from a parent assembly to a component.
component item
An item associated with a parent item on a bill of material.
component yield
The percent of the amount of a component you want to issue to build an assembly that actually becomes part of that assembly. Or, the amount of a component you require to build plus the amount of the component you lose or waste while building an assembly. For example, a yield factor of 0.90 means that only 90% of the usage quantity of the component on a bill actually becomes part of the finished assembly.
compression days
The number of days the planning process suggests you compress the order (in other words, reduce the time between the start date and the due date).
D
discrete job
Discrete jobs are used to manufacture assemblies using specific materials and resources within a start and end date. (Also known as work order or assembly order).
E
ECO
See engineering change order (ECO).
end item
Any item that can be ordered or sold.
engineering change order (ECO)
A record of revisions to one or more items usually released by engineering.
F
firm planned order
An MRP-planned order that is firmed using the Planner Workbench. This enables the planner to firm portions of the material plan without creating discrete jobs or purchase requisitions. Unlike a firm order, a MRP firm planned order does not create a natural time fence for an item.
forecast
An estimate of future demand on inventory items. A forecast contains information on the original and current forecast quantities (before and after consumption), the confidence factor, and any specific customer information. You can assign any number of inventory items to the forecast and use the same item in multiple forecasts. For each inventory item you specify any number of forecast entries.
H
highest level item
Item which sits on the top of the substitution chain. Usually this is the item, which is more functionally rich when compared to other items in the substitution chain.
I
independent demand
Demand for an item unrelated to the demand for other items.
item routing
A sequence of manufacturing operations that you perform to manufacture an assembly. A routing consists of an item, a series of operations, an operation sequence, and operation effective dates. Edits to an Item Routing do not automatically update a job routing.
J
job routing
A snapshot of an item routing that has been assigned to a job. The routing is current on the day the job was created. Edits to a job routing do not automatically revert to the item routing.
M
make order
An order to manufacture an item. The following Oracle Applications entities are make orders: - Batches (Oracle Process Manufacturing) - Discrete jobs (Oracle Work in Process) - Flow schedules (Oracle Flow Manufacturing) - Jobs (Oracle Project Manufacturing) - Jobs (Oracle Shopfloor Management (OSFM))
master demand schedule
The anticipated ship schedule in terms of rates or discrete quantities, and dates. In ASCP, MDS is used as an input to the enterprise plan.
material and resource constrained plan
In this plan, you can generate a plan that respects material, resource, and transportation constraints. However, no plan objectives are considered.
material constrained plan
In this plan, all material constraints that can be specified in the form of a supply schedule from manufacturing plants or by statements of vendor capacity from vendors are considered. When material availability is not a concern, resource availability constraints are used only to generate exceptions arising due to over utilization or under-utilization of resources.
multilevel supply chain ATP/CTP/CTD
This term is used to describe the task of performing a multilevel BOM availability check including finished goods, components, resource, supplier capacity and transportation lead time.
N
need by date
The need by date for the end item is the demand date. The need by dates for the dependent demands are calculated based on the lead-time offsets that are associated to the Items and routings used.
  • For a constrained plan, the planning process uses planned orders and routings to derive the suggested due date.

  • For an unconstrained plan, , the suggested due date is the need by date.

Therefore, any differences between the lead time offsets (need by date) and actual manufacturing time (suggested due date) created by the planning process, will show up in the form of multiple exception messages.
O
ODS
See operation data store (ODS).
operation data store (ODS)
All the tables that are the destination for the collected data from transaction systems (both Oracle Applications and legacy systems). This acts as the input for the snapshot portion of the planning process. When we refer to ODS based ATP, we mean ATP based on collected data.
optimized plan
An optimized and executable plan based on plan objectives as well as material, resource, and transportation constraints.
original item
An item for which you received demand.
overload
The condition where required capacity for a resource or production is greater than available capacity.
P
PDS
See planning data store (PDS).
pegging
The capability to identify for a given item the sources of its gross requirements and/or allocations. Pegging can be thought of as active where-used information.
planned order
A suggested quantity, release date, and due date that satisfies net item requirements.
Planner Workbench
A form that you use to research exception messages and to act on recommendations generated by the planning process for a plan. You can implement planned orders as discrete jobs or purchase requisitions, maintain planned orders, reschedule scheduled receipts, and implement repetitive schedules. You can choose all suggestions from a plan or only those that meet a certain criteria.
planning data store (PDS)
All the tables within Oracle Advanced Supply Chain Planning--the ODS and other output tables from planning. When we refer to PDS-based ATP, we mean ATP based on planning output.
planning exception set
An item attribute the planning process uses to decide when to raise planning exceptions for the item.
planning horizon
The amount of time a schedule extends into the future.
planning time bucket
A time period into which the planning engine accumulates time-phased data and nets (performs the gross to net explosion on) that data as a unit. The planning engine plans in planning time buckets of minutes, hours, days, weeks, and periods (months).
planning time fence
An item attribute used to determine a future point in time inside which there are certain restrictions on the planning recommendations the planning process can make for the item.
postprocessing lead time
The time required to receive a purchased item into inventory from the initial supplier receipt, such as the time required to deliver an order from the receiving dock to its final destination.
preprocessing lead time
The time required to place a purchase order or create a discrete job or repetitive schedule that you must add to purchasing or manufacturing lead time to determine total lead time. If you define this time for a repetitive item, the planning process ignores it.
processing lead time
The time required to procure or manufacture an item. For manufactured assemblies, processing lead time equals the manufacturing lead time.
production activity control
The function of routing an dispatching the work to be accomplished through the production facility and of performing supplier control.
projected available balance
Quantity on hand projected into the future if scheduled receipts are rescheduled or cancelled, and new planned orders are created as per recommendations made by the planning process. Calculated by the planning process as current and planned supply (nettable quantity on hand + scheduled receipts + planned orders) minus demand (gross requirements). Note that gross requirements for projected available includes derived demand from planned orders. Note also that the planning process uses suggested due dates rather than current due dates to pass down demand to lower level items. .
R
resource constrained plan
The planning engine considers all resource constraints such as available machine hours, transportation capacity, as well as alternate resources. It considers alternate bill of materials only in an optimized plan. Material constraints are used only to generate exceptions arising due to lack of material availability.
routing
A sequence of manufacturing operations that you perform to manufacture an assembly. A routing consists of an item, a series of operations, an operation sequence, and operation effective dates.
S
safety stock
Quantity of stock planned to have in inventory to protect against fluctuations in demand and/or supply.
scheduled receipt
A discrete job, repetitive schedule, non-standard job, purchase requisition, or purchase order. It is treated as part of available supply during the netting process. Schedule receipt dates and/or quantities are not altered automatically by the planning system.
seiban manufacturing
A manufacturing environment in which demand and supply are identified by seiban numbers that peg supply to demand. This numbering system is widely used in Japan and Korea.
shipping
The function that performs tasks for the outgoing shipment of parts, components, and products. It includes packaging, marking, weighing and loading for shipment.
simultaneous resources
Two or more resources are scheduled to be working concurrently within a job operation. Each operation contains a scheduled sequence of activities and resources used in the operation. Simultaneity is implemented by having more than one resource used in an operation.
sourcing rule
Specifies how to replenish items in an organization, such as purchased items in plants.
substitution chain
Several revisions of items with strict predecessor and successor relationships amongst them. In some cases various revisions are modeled as different items forming a substitution chain.
suggested dock date
The date you expect to receive an order (to arrive on the receiving dock) as suggested by the planning process.
suggested due date
The date when scheduled receipts are expected to be received into inventory and become available for use as suggested by the planning process. See also need by dateThe need by date for the end item is the demand date. The need by dates for the dependent demands are calculated based on the lead-time offsets of the items and routings..
suggested start date
The date you or your suppliers expect to start to manufacture the order as suggested by the planning process.
supply chain
The processes from the initial raw materials to the ultimate consumption of the finished product linking across supplier-user companies. The functions inside and outside a company that enable the value chain.
supply chain ATP
This term is used to describe the task of performing an ATP check against multiple sourcing organizations for a given customer request.
supply chain management
The planning, organization, and controlling of supply chain activities.
supplier flexfences
Specifies capacity tolerance percentages that vary over time for each source. This allows you to represent the ability of your supplier to flex capacity upwards based on the amount of advanced notice you provide.
T
time bucket
A unit of time used for defining and consuming forecasts. A bucket can be one day, one week, or one period.
U
unconstrained plan
The planning process assumes infinite material availability and resource capacity. Statements of material availability and resource capacity are used to generate exceptions. Demand priorities are included during the planning run to determine the appropriate pegging relationships between supply and demand.
underload
A condition where required capacity for a resource or production is less than available capacity.
W
workday calendar
A calendar that identifies available workdays for one or more organizations. The planning process plans and schedules activities based on an entity's available workdays.