Backflush Lot Selection

Examples for Lot Selection Defaulting during Backflush Transactions

When there are multiple backflush transactions for the same component, on the same job—you can set the selection method for defaulting lot numbers used in the previous transactions. The following examples demonstrate how transactions and parameter setup determine the lot selection. See: Material Parameters

No Existing Previous Backflush Transactions

Manual Push Transactions

In this example, the Work in Process Parameter setup is:

Previous Backflush Transaction History, No Alternate Lot Selection Method

Previous Backflush Transaction History with Alternate Lot Selection Method

Alternate Lot Selection Method with No On-hand Lot Quantity

All Backflush Transactions Considered as Transaction History

Backflush History Does Not Span Across Jobs

Backflush Transaction History Includes Multiple Lots with On-hand Quantity