Sun Cluster 3.0 12/01 System Administration Guide

5.1.1 Dynamic Reconfiguration With Cluster Interconnects

There are a few issues you must consider when completing dynamic reconfiguration (DR) operations on cluster interconnects.


Caution - Caution -

Sun Cluster requires that each cluster node has at least one functioning path to every other cluster node. Do not disable a private interconnect interface that supports the last path to any cluster node.


Complete the following procedures in the order indicated when performing DR operations on public network interfaces.

Table 5-2 Task Map: Dynamic Reconfiguration with Public Network Interfaces

Task 

For Instructions, Go To... 

1. Disable and remove the interface from the active interconnect 

"5.1.4 How to Remove Cluster Transport Cables, Transport Adapters, and Transport Junctions"

2. Perform the DR operation on the public network interface. 

Sun Enterprise 10000 Dynamic Reconfiguration User Guide and the Sun Enterprise 10000 Dynamic Reconfiguration Reference Manual (from the Solaris 8 on Sun Hardware collection)