Diagram showing the site preparation process process to obtian system configuration from sales engineer. Then determine the amount of cooling needed by reviewing the system cabinet power and cooling requirements. Determine the type and amount of power receptacles needed. Determine the space requirements and location of the system. Determine the type and amount of networking cables needed. Determine all dynamic system domain information then schedule all necessary modifications and obtain any necessary hardware. PLan for equipment arrival. Complete and review all worksheets and checklist. Schedule the installation date based on the anticipated copmletion date of site and system arrival. For Sun service personnel, fill out and return the electronic installation report.