Sun Fire E2900 Systems Getting Started
|
|
1.1 Accessing the Sun Fire E2900 Documentation Files
The full documentation set for Sun Fire E2900 systems is available on the documentation CD (doc CD).
1. Insert the doc CD into a CD-ROM or DVD-ROM drive.
- If you are accessing the doc CD from a Power Macintosh, PC, or if your system is running Volume Manager, the CD-ROM will mount automatically.
- If your system is not running Volume Manager, become superuser and mount the CD-ROM manually by typing:
# mkdir -p /cdrom/cdrom0
# mount -o ro -F hsfs /dev/dsk/c0t6d0s2 /cdrom/cdrom0
|
The above command applies to workstations with SCSI drives. If your workstation has an IDE drive, the device is /dev/dsk/c0t2d0s2.
2. Open the cdrom0 directory to access the PDF files with Adobe® Acrobat Reader. If you do not have Adobe Acrobat Reader installed, you can download it at no cost, at:
http://www.adobe.com/products/acrobat/readstep.html
1.2 List of Sun Fire E2900 Systems Documentation
|
System Planning
|
Sun Fire E2900 Systems Pre-Sales
- Sun Fire E2900 Systems Site Planning Guide
|
|
System Installation
|
Sun Fire E2900 Systems Kit
- Sun Fire E2900 Systems Unpacking Guide
- Sun Fire E2900 Systems Getting Started
- Sun Fire E2900 Systems Installation Guide
Sun Fire E2900 Systems Doc CD
- Sun Fire Entry-Level Midrange Systems Administration Guide
- Sun Fire Entry-Level Midrange System Controller Command Reference Manual
|
|
Administration
|
Sun Fire E2900 Systems Doc CD
- Sun Fire E2900 Systems Software Release Notes
- Sun Fire Entry-Level Midrange Systems Administration Guide
- Sun Fire Entry-Level Midrange System Controller Command Reference Manual
Other Sun Fire E2900 Systems Docs
- Sun Management Center User's Guide
- Solaris System Administration Guide
|
|
Repair and Troubleshooting
|
Sun Fire E2900 Systems Doc CD
- Sun Fire E2900 Systems Service Manual
- Sun Fire Entry-Level Midrange Systems Administration Guide
Other Sun Fire E2900 Systems Docs
- Sun Management Center User's Guide
- Solaris System Administration Guide
|
|
Globalization
|
Sun Fire E2900 Systems Doc CD
- French, German, Italian, Spanish, Swedish, Japanese, Korean, Simplified Chinese, and Traditional Chinese
|
1.3 Installation Task Map for Sun Fire E2900 Systems Pre-Mounted in a Sun Rack
|
Step 1
|
- Verify power, air conditioning, and floor area requirements -- Refer to the Sun Fire E2900 Systems Site Planning Guide.
|
Step 2
|
- Set up the Sun Rack and connect the power cables -- Refer to the Sun Rack Installation Guide.
|
Step 3
|
- Connect an administrative console to access the system controller -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 4
|
- Power on the Sun Rack -- Refer to the Sun Rack Installation Guide.
- Power on the individual systems -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 5
|
- Allow the system to run through POST and ensure there are no errors, then power off the systems and the Sun Rack.
|
Step 6
|
- Power off the system -- Refer to the Sun Fire E2900 Systems Installation Guide.
- Power off the cabinet -- Refer to the documentation that came with the cabinet.
|
Step 7
|
- Install options and storage devices -- Refer to the documentation that came with the option or storage device for details.
|
Step 8
|
- Power on the Sun Rack -- Refer to the Sun Rack Installation Guide.
- Power on the individual systems -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 9
|
- Configure the system -- Refer to the Sun Fire E2900 System Administration Guide.
- Create additional domains (if needed) -- Refer to the Sun Fire Entry-Level Midrange Systems Administration Guide.
|
Step 10
|
- Install the Solaris software on each domain -- Refer to the Solaris Installation Guide.
- Boot the Solaris software on each domain -- Refer to the Sun Fire Entry-Level Midrange Systems Administration Guide.
|
1.4 Installation Task Map for Rackmounting Sun Fire E2900 Systems
|
Step 1
|
- Verify power, air conditioning, and floor area requirements -- Refer to the Sun Fire E2900 Systems Site Planning Guide.
|
Step 2
|
- Set up the cabinet and connect the power cables -- Refer to the documentation that came with the cabinet.
|
Step 3
|
- Mount the system into the cabinet and connect power cables -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 4
|
- Connect an administrative console to access the system controller -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 5
|
- Power on the cabinet -- Refer to the documentation that came with the cabinet.
- Power on the individual systems -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 6
|
- Allow the system to run through POST and make sure there are no errors.
|
Step 7
|
- Power off the system -- Refer to the Sun Fire E2900 Systems Installation Guide.
- Power off the cabinet -- Refer to the documentation that came with the cabinet.
|
Step 8
|
- Install options and storage devices-- Refer to the documentation that came with the option or storage devices for details.
|
Step 9
|
- Power on the cabinet -- Refer to the documentation that came with the cabinet.
- Power on the system -- Refer to the Sun Fire E2900 Systems Installation Guide.
|
Step 10
|
- Configure the system -- Refer to the Sun Fire Entry-Level Midrange Systems Administration Guide
- Create additional domains (if needed) -- Refer to the Sun Fire Entry-Level Midrange Systems Administration Guide.
|
Step 11
|
- Install the Solaris software on each domain -- Refer to the Solaris Installation Guide.
- Boot the Solaris software on each domain -- Refer to the Sun Fire Entry-Level Midrange Systems Administration Guide.
|
Sun Fire E2900 Systems Getting Started
|
817-4491-10
|
|
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.