| C H A P T E R 1 |
|
Installation Overview |
This chapter provides an overview of the tasks to install the Netra CT 820 server. Detailed instructions for each task are provided on the pages specified.
|
Connect the cables to the rear transition card for the distributed management cards. |
|
|
Connect the cables to the rear transition card for the switching fabric boards. |
|
|
Note - Refer to the Netra CT 820 Server Release Notes (817-2646-13, or future compatible revisions) for the Solaris Operating System installation instructions. |
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.