Oracle Waveset 8.1.1 Resources Reference
Testing the Change Pointer Configuration
To Test the Change Pointer Configuration
-
From the SAP client, hire an employee.
-
Ensure that an IDoc was created. You can verify IDoc creation
in two locations:
-
Enter transaction code WE02, enter search date parameters
and generate a list of generated IDOCs
-
Check the SAP HR Active Sync adapter log
- © 2010, Oracle Corporation and/or its affiliates