Oracle Waveset 8.1.1 Business Administrator's Guide

ProcedureTo Schedule a Risk Analysis Report

Once defined, you can use the following steps to schedule risk analysis reports to run at specified intervals.

  1. In the Administrator interface, click Server Tasks in the main menu.

  2. Click Manage Schedule in the secondary menu.

    The Scheduled Tasks page opens.

  3. Select a risk analysis report to schedule.

    The Create New Risk Analysis Task Schedule page opens.

  4. Enter a name and schedule information, and then optionally adjust other risk analysis selections.

  5. Click Save to save the schedule.