There are two types of verification presented in this chapter: verifying directly after installation, and verifying after all post-installation configuration is done.
Verifying after installation: This type of verification is used to discover if installation was basically successful; only some components can be started and stopped at this point.
Verifying after post-installation configuration is complete: This type of verification is used to verify that all the components can be started and are capable of running. Instructions for starting and stopping each component individually are included.
The default installation locations of Communications Suite product components are different on the various operating system. Due to this difference, the procedures in this chapter use placeholders to represent these locations. For example, AccessManager-base represents the base installation directory for Access Manager.