Move your cursor over the connector portion of your modeling element.
Hold the cursor over the outside edge of the modeling element until it changes from the arrow pointer to a hand.
See Figure 6–2.
Click down, and drag a line from the first activity to the connector of the second activity.
When the link attaches, release the mouse button.