The Sun Update Connection - ABMS 1.0 service offering that uses the TLP 2.3 tool is divided into two stages, an initial stage and an ongoing stage. Table 1–2 describes these activities and deliverables.
Table 1–2 Sun Update Connection - ABMS 1.0 Service Offering Activities and Deliverables
Task |
Stage/Frequency of Occurrence |
---|---|
Determine strategy |
Initial |
Determine frequency of patch cycles |
Initial (Default: quarterly) |
Define test scenarios |
Initial |
Determine fallback/back-up mechanism |
Initial |
Install TLP tools |
Initial |
Instruct system administrators in the use of TLP tool |
Initial |
Run patch updates |
Ongoing |
Update patch baselines |
Ongoing (up to 4 times per year) |
Automatic data analysis |
Ongoing |
Automatic generation of system-specific patch sets |
Ongoing |
Install patch sets |
Ongoing |
This guide does not contain information on all of the tasks that are described in the previous table. Information about patch strategy, including the Patch Strategy Checklist, can be found at http://onestop/tlp. Information on Solaris patch management strategy can be found at http://docs.sun.com/db/doc/817-0574-12.