Step 1
|
- Verify power, air conditioning, and floor area requirements. -- Refer to the SPARC Enterprise M4000/M5000 Servers Site Planning Guide and the SPARC Enterprise Equipment Rack Mounting Guide.
|
Step 2
|
- Set up the equipment rack. -- Refer to the SPARC Enterprise Equipment Rack Mounting Guide.
|
Step 3
|
- If your server was preinstalled in an equipment rack, proceed to Step 5 to connect your console to a server.
- If your server needs to be rackmounted in an equipment rack, proceed to Step 4.
|
Step 4
|
- Mount the server in the equipment rack. -- Refer to the SPARC Enterprise Equipment Rack Mounting Guide.
|
Step 5
|
- Connect the console to a server. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 6
|
- Connect the power cables. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 7
|
- Power on the input power source. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 8
|
- Prepare information for hardware configuration. -- Refer to the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers User’s Guide for XSCF.
|
Step 9
|
- Power on the server. Check that POST runs successfully on the eXtended system control facility unit (XSCFU) and confirm there are no errors. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 10
|
- Set up the XSCFU for network access. -- Refer to the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers Administration Guide.
|
Step 11
|
- If additional hardware or peripheral devices are to be installed into your server, proceed to Step 12.
- If additional hardware or peripheral devices are not to be installed into the server, proceed to Step 16.
|
Step 12
|
- Turn off the input power source. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 13
|
- Install additional hardware or peripheral devices. -- Refer to the documentation that came with the hardware or peripheral devices for details.
|
Step 14
|
- Turn on the input power source. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 15
|
- Allow each domain to run through POST and confirm there are no errors.
|
Step 16
|
- Check the network settings and connections. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide.
|
Step 17
|
- Confirm operation by using Oracle VTS software. -- Refer to the SPARC Enterprise M4000/M5000 Servers Installation Guide and the Oracle VTS user’s guide.
|
Step 18
|
- Make the initial settings for each domain. -- Refer to the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers Administration Guide.
|