The calculated mean time between failures is 200,000 hours minimum at 25C. Compliance with reliability and other standards is documented in the following table.
Table 3.5. Sun Ray 3 Plus Client PSU Reliability and Other Standards
IEC 60068-1 | Environmental Testing - Part 1: General and guidance |
IEC 60068-2-1 | Environmental Testing - Part 2: Tests A: Cold -50 |
IEC 60068-2-2 | Environmental Testing - Part 2: Tests B: Dry heat +140 |
IEC 60068-2-3 | Environmental Testing - Part 2: Test Ca: Damp heat |
IEC 60068-2-6 | Environmental Testing - Part 2: Test Fc and guidance: Vibration (sinusoidal) |
IEC 60068-2-13 | Environmental Testing - Part 2: Test M: Low air pressure |
IEC 60068-2-27 | Environmental Testing - Part 2: Test Ea and guidance: Shock |
IEC 60068-2-31 | Environmental Testing - Part 2: Test Ec: Drop and topple, primarily for equipment-type specimens |
IEC 60068-2-32 | Environmental Testing - Part 2: Test Ed: Free fall |
IEC 60068-2-56 | Environmental Testing - Part 2: Test Cb: Damp heat, steady state, primarily for equipment |
IEC 60068-2-64 | Environmental Testing - Part 2: Test Fh: Vibration, broad-band random (digital control) and guidance |
ASTM D3332 | Standard Test Methods for Mechanical-Shock Fragility of Products, Using Shock Machines |
U.S. CFR1194 | Section 508 of the U.S. Rehabilitation Act of 1986, as amended by the Workforce Investment Act of 1998 |