37 System Setup Processing Options

This chapter contains these topics:

37.1 General User-Defined Codes (P0005A)

Processing Option Processing Options Requiring Further Description
DEFAULT CODE/TYPE:  
1. Enter the desired Install System Code.  
2. Enter the desired Record Type.  

37.2 Generic Rate/Message Records Program (P00191)

Processing Option Processing Options Requiring Further Description
USER DEFINED CODES:  
1. Enter the desired System Code.  
2. Enter the desired Record Type.  
DISPLAY INFORMATION:  
3. Enter an '1' to display Rate Text or

Enter an '2' to display Message Text

 
4. If displaying Message Text,

Enter an '1' for 60 column display or

Enter an '2' for 80 column display

 

37.3 Work Center Resource Units Refresh (P3007G)

Processing Option Processing Options Requiring Further Description
GENERATION INFORMATION:  
1. Enter the Start Date.  
2. Enter the End Date.

Note: The program will regenerate resource units for the entire month of the start date and the entire month of the end date.

 
3. Enter the Branch/Plant to be processed.  
4. Enter a string of up to 6 shift codes to be processed ('123 ').

If left blank, all shifts will be processed.

 

37.4 Kanban Size Calculation (P30450)

Processing Option Processing Options Requiring Further Description
PROCESSING CONTROL:  
1. Enter a '1' to calculate Kanban sizes.  
2. Enter a '1' to update Kanban Master file.  
3. Enter a '1' to print Kanban cards.  
4. Enter a '1' to print Kanban Exception Report.  
SAFETY STOCK:  
5. Enter the desired safety stock expressed as a percentage of daily production. ('15' = 15%)  
FILTER CONTROL:  
6. Enter the range, expressed as a percentage, above or below which the Kanban should not be changed.

('15' = plus or minus 15%)

 
KANBAN AVERAGE DAILY DEMAND:  
7. Enter a '1' to select summation of the MPS/MRP demands desired, or enter a '2' to select greater of MPS/MRP demands desired. If no demands are selected, the Planning Time Fence Rule for the item will be used.

a. Forecasts

b. Sales Orders

c. Firm Work Orders

d. Planned Orders

e. Rate Schedule

 
CALCULATION:  
8. Enter number of hours equivalent to one day. (Default is 8)  
9. Enter the date range to use for the average daily demand calculation.

a. Beginning Date (Required)

b. Ending Date (Required)

 
USER DEFINED PROGRAM:  
10. Enter the program name of the Kanban size calculation program.  
BAR CODE INFORMATION:  
11. Enter the format for bar code printing.

1 = Code 3 of 9 (Code 39)

2 = Code 128

If left blank, bar codes will not print.