This appendix covers the following topics:
This appendix provides the navigation paths for Oracle Complex Maintenance, Repair, and Overhaul:
Brackets surrounding an entity in a path indicates a button selection.
Braces surrounding an entity indicates a drop-down menu option.
Tabs, Secondary tabs, Links, and Icons are noted for the related entity.
| Window or Page Name | Navigation Path |
|---|---|
| Add Alternates | Configuration > Master Configuration (tab) > Alternate Parts (secondary tab) > [Create] |
| Add Availability Restriction | Administration > Space Unavailability (tab) > [Create] |
| Add Space | Administration > Spaces (tab) > [Create] |
| Add Units - Search Unit Configuration | Planning > Forecasting > Fleet -Unit Association > Search Fleet-Unit Associations > Applicable Units > Add Units |
| Aircraft Maintenance Status | Administration > Maintenance Requirement Status Reports > Aircraft Maintenance Status |
| Assembly Bills of Material | Complex MRO > Administration > Reports > Assembly Bills of Material |
| Associate Document Sub Type To Document Type | Engineering > Document Index (tab) > Associate type (secondary tab) |
| Associate Major Zone To Item Type | Engineering > Route Management (tab) > Major Zones (secondary tab) |
| Associate Operations | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Associate Operations |
| Associate Sub Zone To Item Type | Engineering > Route Management (tab) > Sub Zones (secondary tab) |
| Attach Reference Documents (for an Operation) | Engineering > Route Management (tab) > Operations (secondary tab) > select record > Operation > Reference Documents |
| Attach Reference Documents (for a route) | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Reference Documents |
| Available Items | Marshalling Workbench > Visit Details > Available Items (link) |
| Bulk Part Installation | Execution > Production Planning > Work Orders > Perform Search > Update Work Orders (Action Item) > Work Order Operations >Bulk Part Install (Select Action Item) |
| Bulk Part Removal | Execution > Production Planning > Work Orders > Perform Search > Update Work Orders (Action Item) > Work Order Operations > Select Action Item, Bulk Part Removal |
| Cannibalization | Complex MRO Material Marshalling User > Demand and Supply Management > Select AOG in selection criteria > Select Material (line) > Click the AOG icon (line item) |
| Common Setup | Administration > Reports > Common Setup |
| Component Maintenance Status | Administration > Reports > Component Maintenance Status |
| Component Removal Forecast | Administration > Reports > Component Removal Forecast |
| Component Removal/Installation History | Administration > Reports > Component Removal/Installation History |
| Component Technician Workbench | Complex MRO Component Technician > Component Technician > My Work Orders |
| Composition Selection | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Disposition Associations > Disposition Details > [Select from Composition] |
| Copy Product Classification | Configuration > Product Classification (tab) > [Copy] |
| Copy to a New Plan | Planning > Fleet Forecasting > Simulations (secondary tab) > select record > [View Plan] > select record > [Copy To a New Plan] |
| Visit Cost Price Budget | Planning > Visit Work Package (tab) > select record > Select Visit action list > Visit Cost Price Budget > [Go] |
| Counter Associations | Administration > Reliability (tab) > Counter Associations |
| Counters for Utilization History | Administration > Utilization History (tab) > Counter Setup |
| Create Composition List | Engineering > Route Management (tab) > Item Compositions (secondary tab) > [Create] |
| Create Department Shift | Administration > Department Shift (tab) > [Create] |
| Create Document | Engineering > Document Index (tab) > [Create] |
| Create Exchange Order | Execution > Outside Processing (tab) > {Create OSP] > select job record > [Create Exchange] |
| Create Fleet | Planning > Fleet Forecasting > Fleets > [Create] |
| Create Forecast Association | Administration > Reliability (tab) > Forecast Associations > [Create] |
| Create Loan Order | Execution > Outside Processing (tab) > {Create OSP] > select job record > [Create Loan] |
| Create Maintenance Requirement | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > [Create] |
| Create Maintenance Requirement Non-routine Profiles | Engineering > Reliability > Nonroutine Profiles > [Create} |
| Create Master Configuration | Configuration > Master Configuration (tab) > Overview (secondary tab) > Create |
| Create MEL/CDL | Engineering > MEL/CDL (tab) > Overview > Search Product Classification > [Go] > [Tree] > [select Node] > Node Details > [Create] |
| Create New Revision | Engineering > Document Index (tab) > Search (secondary tab) > select record > [Create New Revision] |
| Create Non-routine | Planning > Unit Maintenance Plan > Non-routines > Search Non-routine > [Create] |
| Create Operation | Engineering > Route Management (tab) > Operations (secondary tab) > [Create] |
| Create OSP Line | Execution > Outside Processing (tab) > select record > Order Number > [Create Order Line] |
| Create OSP Order | Execution > Outside Processing (tab) > {Create OSP] > select job record > [Create OSP] |
| Create Planned Task | Planning > Visit Work Package (tab) > select record > Visit number > Visit Tasks > [Create Planned Task] > select unit maintenance plan > {Associate to Visit} > [Go] |
| Create Primary Visit Request | Planning > Auto Visit Planning > Primary Visit Requests > [Create] |
| Create Product Classification | Configuration > Product Classification (tab) > [Create] |
| Create Relationship | Administration > Vendor Sourcing > Item Service Relationships > Create Relationship |
| Create Reliability Definition | Administration > Reliability (tab) > Reliability Definitions > [Create] |
| Create Resources | Engineering > Route Management (tab) > Resources (secondary tab) > [Create] |
| Create Route | Engineering > Route Management (tab) > Routes (secondary tab) > [Create] |
| Create Rule | Configuration > Master Configuration (tab) > Overview (secondary tab) > select record > Name > {Rules} > [Create Rule] |
| Create Service Request | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Create Service Request} > [Go] |
| Create Shipment Line | Execution > Outside Processing (tab) > select record > Order Number > Shipments > [Create Shipment Line] |
| Create Summary Task | Planning > Visit Work Package > Visits > Select visit (link) > Visit Tasks tab > {Create Summary Task} from Select Task drop-down |
| Create Unassociated Task | Planning > Visit Work Package > Visits > Select visit (link) > Visit Tasks tab > Create Unassociated Task from Select Task drop-down) |
| Create Unit Configuration | Configuration > Unit Configuration (tab) > Create From Master (secondary tab) > [Create Unit configuration] |
| Create Unplanned Task | Planning > Visit Work Package (tab) > select record > {Search Task} > Create Unplanned Task > select maintenance requirement > [Associate to Visit] |
| Create Visit | Planning > Visit Work Package (tab) > [Create] |
| Create Visit Types | Administration > Visit Types > Visit Types > [Create] |
| Create Warranty Claim | Configuration > Supplier Warranty > Claim Management > Search Warranty Claim >[Create] |
| Create Warranty Template | Configuration > Supplier Warranty > Create Warranty Template > [Create] |
| Customer Relationships | Administration > Vendor Sourcing > Customer Relationships |
| Data Clerk Workbench | Complex MRO Data Clerk > Data Clerk > Work Orders |
| Define Disposition Associations | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Disposition Associations |
| Define Material Requirements (for an operation) | Engineering > Route Management (tab) > Operations (secondary tab) > select record > Operation > Material Requirements |
| Define Material Requirements (for a route) | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Material Requirements |
| Define Repair Batch Workscope | Planning > Component Maintenance > Repair Batches > Edit icon for batch (line) |
| Define Resource Requirements (for an operation) | Engineering > Route Management (tab) > Operations (secondary tab) > select record > Operation > Resource Requirements |
| Define Resource Requirements (for a route) | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Resource Requirements |
| Disposition List Details | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Disposition Associations > Disposition Details |
| Distribution Information | Engineering > Document Index (tab) > Search (secondary tab) > select record > Document Num > Distribution |
| Edit Access Panels | Engineering > Route Management (tab) > Operations (secondary tab) > Access Panels Engineering > Route Management (tab) > Routes (secondary tab) > Access Panels |
| Edit Alternates | Configuration > Master Configuration (tab) > Alternate Parts (secondary tab) > select record > Group Name |
| Edit Associated Positions | Configuration > Master Configuration (tab) > Alternate Parts (secondary tab) > select record > {View Positions} > [Go] |
| Edit Availability Restriction | Administration > Space Unavailability (tab) > select record > Space |
| Edit Document | Engineering > Document Index (tab) > Search (secondary tab) > select record > Document Num |
| Edit Document Associations | Configuration > Master Configuration (tab) > Overview (secondary tab) > select record > Name > {Documents} |
| Edit Exchange Order | Execution > Outside Processing (tab) > select record > order number |
| Edit Fleet | Planning > Fleet Forecasting > Fleets > Edit Fleet |
| Edit Maintenance Requirement Non-routine Profile | Engineering > Reliability > Nonroutine Profiles > Search for record |
| Edit Master Configuration | Configuration > Master Configuration (tab) > Overview (secondary tab) > select record > [Edit] |
| Edit Operation | Engineering > Route Management (tab) > Operations (secondary tab) > select record > Operation |
| Edit OSP Order | Execution > Outside Processing (tab) > select record > Order Number |
| Edit OSP Line | Execution > Outside Processing (tab) > select record > Order Number > Line Number |
| Edit Product Classification | Configuration > Product Classification (tab) > select record > Tree |
| Edit Reliability Definition | Administration > Reliability (tab) > Reliability Definitions > Select Position > [Associate] |
| Edit Revision | Engineering > Document Index (tab) > Search (secondary tab) > select record > [Edit Revision] |
| Edit Rules | Configuration >Master Configuration (tab) > Overview (secondary tab) > select record > Name > {Rules} |
| Edit Shipment Header | Execution > Outside Processing (tab) > select record > Order Number > Shipments |
| Edit Shipment Line | Execution > Outside Processing (tab) > select record > Order Number > Shipments > select record > Line Number |
| Edit Space | Administration > Spaces (tab) > Space |
| Edit Subscription Information | Engineering > Document Index (tab) > Search (secondary tab) > select record > Document Num > Subscription |
| Edit Unit Configuration | Configuration > Unit Configuration (tab) > Search Unit (secondary tab) > select record > Edit |
| Electronic File Upload | Engineering > Document Index (tab) > Search (secondary tab) > select record > [Upload] |
| Fleet Downtime Percentage Report | Administration > Maintenance Requirement Status Reports > Fleet Downtime Percentage Report |
| Flight Schedules | Complex MRO Transit Technician > Transit Technician > Flight Schedule |
| Forecast Associations | Administration > Reliability (tab) > Forecast Associations |
| Group Maintenance Requirement | Planning > Unit Maintenance Plan (tab) > Overview (secondary tab) > select record > {View Group MR} > [Go] |
| Initialize Maintenance Requirement | Planning > Unit Maintenance Plan (tab) > Overview (secondary tab) > Click the Group Relation icon for the record |
| Item Instance Details | Planning > Visit Work Package > Visits > Repair Workscope > Instances in Visit region |
| Item Number/Serial Number Change | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > {Item/Serial Number Change} > [Go] |
| Item Service Relationships | Administration > Vendor Sourcing > Item Service Relationships |
| Items without Price | Planning > Visit Work Package (tab) > select record > {Cost and Price Information} > [Go] > Maintenance Requirements > select requirement > Cost/Price > [Items Without Price] |
| Maintenance Requirement Cost and Price | Planning > Visit Work Package (tab) > select record > {Cost and Price Information} > [Go] > Maintenance Requirements > select requirement > Cost/Price |
| Maintenance Requirement Deferral Details | Execution > Production Planning (tab) > Maintenance Requirements (secondary tab) > select record > [Defer] |
| Maintenance Requirement Information Details and Status | Complex MRO > Administration > Reports >Maintenance Requirement Information Details and Status |
| MR - Maintenance Organizations | Engineering > Fleet Maintenance Program > Maintenance Organizations |
| Maintenance Requirement Relationships | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Title > Relationships |
| Marshalling Workbench | Complex MRO > Marshalling Workbench Complex MRO Material Marshalling User > Material Marshalling > Visit Management |
| Material Availability | Planning > Visit Work Package > Visits (secondary tab) > select record > [Plan Visit] > Material Availability |
| Material Requirements | Planning > Visit Work Package > Search Visits > Update Visit > Maintenance Requirements |
| MEL/CDL Associations | Engineering > MEL/CDL (tab) > Overview > [Go] > Tree |
| Migrate Unit Configuration | Configuration > Unit Configuration (tab) > Search Unit (secondary tab) > select record > [Migrate] |
| Job Operations | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] |
| Job Overview | Execution > Production Planning (tab) > Work Orders (secondary tab) |
| Operation (Detail) | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > select operation record > [Details] |
| Operational Visit Autocreate | Planning > Auto Visit Planning > Operational Visit Autocreate |
| Part Changes | Administration > Reliability (tab) > Part Change History |
| Part Number Status | Administration > Reports > Part Number Status |
| Perform Material Transactions | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > Material Transactions |
| Perform Resource Transactions | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > Resource Transactions |
| Maintenance Planning Workbench | Planning > Planning Workbench > Maintenance Planning |
| Primary Visit Default Parameters | Planning > Auto Visit Planning > Primary Visit Default Parameters |
| Purchase Order Details | Execution > Outside Processing (tab) > select record > Order Number > PO Details |
| Quick Removal and Installation | Execution > Production Planning > Work Orders > Perform Search > Update Work Orders (Action Item) > Work Order Operations Page > Item Bulk Part Install (Select Action Item) |
| Receive Shipment | Execution > Outside Processing (tab) > OSP Orders (secondary tab) > Receive Shipment |
| Reliability Definitions | Administration > Reliability (tab) > Reliability Definitions |
| Reliability Setup | Administration > Reliability (tab) > Setup |
| Repair Categories | Engineering > MEL/CDL (tab) > Repair Categories |
| Resource Assignments | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > Assignments |
| Resource Leveling | Planning > (tab) > Resource Leveling |
| Resource Requirements | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > Resources |
| Resource Requirement Detail | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > Resources > select requirement > [Details] |
| Required Materials | Execution > Production Planning (tab) > Materials (secondary tab) |
| Route Dependencies | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Title > Routes > Dependency |
| Scheduled Materials | Planning > (tab) > Visits (secondary tab) > select record > [Plan Visit] > Scheduled Materials |
| Schedule Visit | Planning > (tab) > Visits (secondary tab) > [Plan Visit] |
| Schedule Visits | Planning > (tab) > Visits (secondary tab) > [Plan Visit] > Schedule Visits |
| Search Alternate Items | Configuration > Master Configuration (tab) > Alternate Parts (secondary tab) |
| Search Availability Restrictions | Administration > Space Unavailability (tab) |
| Search BOM Resource | Engineering > Route Management (tab) > Resources (secondary tab) > [Create] > [Attach] |
| Search Department Location | Administration > Department Location (tab) |
| Search Department Shift | Administration > Department Shift (tab) |
| Search Document | Engineering > Document Index (tab) |
| Search Entitlements | Configuration > Supplier Warranty > Warranty Entitlements |
| Search Fleets | Planning > Fleet Forecasting > Fleets |
| Search Fleet-Unit Associations | Planning > Fleet Forecasting > Fleet-Unit Association |
| Search Item | Planning > Unit Maintenance Plan (tab) > Utilization Forecast (secondary tab) |
| Search Item Compositions | Engineering > Route Management (tab) > Item Compositions (secondary tab) |
| Search Maintenance Requirements | Planning > Visit Work Package > Visits > Select visit (link) > Maintenance Requirements tab > {Add Unplanned Task} |
| Search Maintenance Requirements | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) |
| Search Maintenance Requirements (for a visit) | Planning > Visit Work Package (tab) > select record > {Maintenance Requirements} > [Go] |
| Search Maintenance Requirements (in the Execution module) | Execution > Production Planning (tab) > Maintenance Requirements (secondary tab) |
| Search Master Configuration | Configuration > Master Configuration (tab) > Overview (secondary tab) |
| Search Non-routine | Planning > Unit Maintenance Plan > Non-routines |
| Search Non-routine Profiles | Engineering > Reliability > Non-Routine Profiles |
| Search Operation | Engineering > Route Management (tab) > Operations (secondary tab) |
| Search OSP Order | Execution > Outside Processing (tab) |
| Search Primary Visit Requests | Planning > Auto Visit Planning > Primary Visit Requests |
| Search Product Classification | Configuration > Product Classification (tab) |
| Search Repair Batch | Planning > Component Maintenance > Repair Batch |
| Search Repair Forecast | Planning > Assembly Maintenance > Repair Forecast |
| Search Repair Items | Planning > Component Maintenance > Repair Items |
| Search Supply and Demand | Planning > Component Maintenance > Supply and Demand |
| Search Resources | Engineering > Route Management (tab) > Resources (secondary tab) |
| Search Route | Engineering > Route Management (tab) > Routes (secondary tab) |
| Search Spaces | Administration > Spaces (tab) |
| Search Unit Configuration | Configuration > Unit Configuration (tab) > Search Unit (secondary tab) |
| Search Unit Maintenance Plan | Planning > Unit Maintenance Plan (tab) > Overview (secondary tab) |
| Search Visit | Planning > Visit Work Package (tab) |
| Search Visits | Planning > (tab) > Visits (secondary tab) |
| Search Visit Task | Planning > Visit Work Package (tab) > select record > {Search Tasks} > [Go] |
| Search Warranty Claim | Configuration > Supplier Warranty > Claim Management |
| Search Warranty Instance | Configuration > Supplier Warranty > Search Warranty Instance |
| Search Warranty Template | Configuration > Supplier Warranty > Search Warranty Template |
| Search Warranty Template | Configuration > Supplier Warranty > Search Warranty Template |
| Serial Number History | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > {Item/Serial Number Change} > [Go] > [View History] |
| Service Bulletin Effectivity Rules | Engineering > Fleet Maintenance Program > Service Bulletin Rules |
| Service Bulletin Effectivity Rules Workbench | Engineering > Fleet Maintenance Program > Service Bulletin Rules > Workbench |
| Scheduled Materials | Planning > (tab)> Visits (secondary tab) > Scheduled Materials |
| Simulation Plans | Planning > (tab) > Simulations (secondary tab) |
| Simulations | Planning > Fleet Forecasting > Utilizations |
| Submit Quality Results (for a job) | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Record Job QA Results} > [Go] |
| Supplier Information | Engineering > Document Index (tab) > Search (secondary tab) > select record > Document Num > Supplier |
| Task Cost and Price | Planning > Visit Work Package (tab) > select record > {Search Tasks} > [Go] > select task > Cost/Price |
| Task Hierarchy | Planning > Visit Work Package (tab) > select record > {Search Tasks} > [Go] > select task > Task Number > Hierarchy |
| Unavailable Items | Material Marshalling User > Visit Management > Results > Details icon > Unavailable Items (link) |
| Unit Schedules | Complex MRO Transit Technician > Transit Technician > Unit Schedule |
| Unit Serial Numbers | Administration > Reports > Unit Serial Numbers |
| Unit Configuration Parts Change/Item Instance Parts Change | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > {Perform Part Removal/Install} > [Go] |
| Unit Configuration Validation Results | Configuration > Unit Configuration (tab) > Search Unit (secondary tab) > select record > [Validate] |
| Unit Maintenance Forecast - MR Forecast | Planning > Fleet Forecasting > Unit Maintenance Forecast |
| Unit Maintenance Plan - View Threshold | Planning > Unit Maintenance Plan (tab) > Overview (secondary tab) > select record > {View Threshold} > [Go] |
| Update Attached Actions | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Actions |
| Update Attached Documents | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Documents |
| Update Attached Documents (for a product classification) | Configuration > Product Classification (tab) > select record > Tree > Documents |
| Update Attached Routes | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Routes |
| Update Attached Units | Configuration > Product Classification (tab) > select record > Tree > Units/Items |
| Update Composition List | Engineering > Route Management (tab) > Item Compositions (secondary tab) > select record > Item |
| Update Costing Parameters (for an operation) | Engineering > Route Management (tab) > Operations (secondary tab) > select record > Operation > Resource Requirements > Costing Parameters |
| Update Costing Parameters (for a route) | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number > Resource Requirements > Costing Parameters |
| Update Effectivity | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Effectivities |
| Update Effectivity Details | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Title > Effectivities >Effectivity Details |
| Update Item Utilization Forecast | Planning > Unit Maintenance Plan (tab) > Utilization Forecast (secondary tab) > select record > [Utilization Forecast] |
| Update Interval Threshold | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Title > Effectivities >Interval Threshold |
| Update Maintenance Requirement | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Title |
| Update Material Requirements | Execution > Production Panning (tab) > Work Orders (secondary tab) > select record > {Update Work Order} > [Go] > Materials |
| Update MEL/CDL | Engineering > MEL/CDL (tab) > Overview > [Go] > Tree |
| Update Resources | Engineering > Route Management (tab) > Resources (secondary tab) > select record > Resource |
| Update Route | Engineering > Route Management (tab) > Routes (secondary tab) > select record > Route Number |
| Update Service Request (in the Execution module) | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {Update/View Service Request} > [Go] |
| Update Task Header | Planning > Visit Work Package (tab) > select record > {Search Tasks} > [Go] > select task > Task Number |
| Update Visit | Planning > Visit Work Package (tab) > select record > Visit number |
| Update Warranty Claim | Configuration > Supplier Warranty > Claim Management > Search Warranty Claims > [Edit] for the warranty line item |
| Update Warranty Template | Configuration > Supplier Warranty > Search Warranty Template > [Edit] for the template line item |
| Update Work Orders | Execution > My Work Orders > My Work Orders > Update Work Orders |
| Vendors | Administration > Vendor Sourcing > Vendors |
| Vendor Sourcing - Vendors | Administration > Vendor Sourcing > Vendors |
| View Affected Items | Engineering > Fleet Maintenance Program (tab) > Overview (secondary tab) > select record > Title > Affected Items |
| View Item Instance Utilization | Configuration > Unit Configuration (tab) > Search Unit (secondary tab) > select record > Edit > [View Utilization] |
| View Maintenance Requirement (for a product classification) | Configuration > Product Classification (tab) > select record > Tree > Maintenance Requirements |
| View Maintenance Requirement Detail & History | Planning > Unit Maintenance Plan (tab) > Overview (secondary tab) > select record > {View Details & History} |
| View Maintenance Requirement (for an Unit Maintenance Plan) | Planning > Unit Maintenance Plan (tab) > Overview (secondary tab) > select record > {View MR Details} > [Go] |
| View Composition Lists | Configuration > Master Configuration (tab) > Composition List (secondary tab) |
| View Documents | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {View Documents} > [Go] |
| View Maintenance Requirement | Execution > Production Planning (tab) > Maintenance Requirements (secondary tab) > select record > Maintenance Requirement |
| View Product Classifications | Engineering > MEL/CDL (tab) > Overview > [Go] > Tree > select unit configuration |
| View Purchase Accounting Distributions | Execution > Outside Processing (tab) > select record > Order Number > PO Details > select line item > [PO Shipments] > select Shipment Number > [Accounting Distributions] |
| View Purchase Order Shipments | Execution > Outside Processing (tab) > select record > Order Number > PO Details > select line item > [PO Shipments] |
| View Receipts | Execution > Outside Processing (tab) > select record > Order Number > PO Details > select line item > [Receipts] |
| View Simulation Plan | Planning > (tab) > Simulations (secondary tab) > select record > [View Plan] |
| View Warranty Claim | Configuration > Supplier Warranty > Claim Management > Search Warranty Claims > Click the Claim Number |
| View Warranty Template | Configuration > Supplier Warranty > Search Warranty Template > Click the Template Name link |
| View Warranty Contract | Configuration > Supplier Warranty > Warranty Contracts > Warranty Contracts > Click Warranty Contract Number link > View Warranty Contract > [View Warranty Workbench] |
| Visit Cost and Price | Planning > Visit Work Package (tab) > select record > {Cost and Price Information} > [Go] |
| Visit Details | Planning > (tab) > Visits (secondary tab) > select record > [Plan Visit] > Scheduled Visits > View Material Marshalling User > Visit Management > Results > Details icon |
| Visit Types | Administration > Visit Types > Visit Types |
| Visit Details: Marshalling | Complex MRO > Marshalling Workbench > Visit Details |
| Visit Errors | Planning > Visit Work Package (tab) > select record > {Validate} > [Go] |
| VWP - Organization Schedule | Planning > Visit Work Package > Visits > Search Visits > Click Visit link > {Schedule option} Select Visit drop-down > [Go] |
| Visits | Complex MRO Transit Technician > Transit Technician > Visits |
| Warranty Contracts | Configuration > Supplier Warranty > Warranty Contracts |
| Warranty Workbench | Configuration > Supplier Warranty > Warranty Contracts > Warranty Contracts > {Edit} (for the warranty contract line item) > [Warranty Workbench] |
| Work Breakdown Structure Rules | Administration > WBS Rules |
| Work Order Material Demand | Material Marshalling User > Material Marshalling > Demand and Supply Management >Demand and Supply Management (tab) |
| Work Order Material Demand | Material Marshalling User > Demand and Supply Management |
| Work Order Material Returns | Execution > Material Transactions > Returns |
| Work Order Materials Issue | Execution > Material Transactions > Issues |
| Work Order Overview | Execution > Production Planning (tab) > Work Orders (secondary tab) |
| Work Order Scheduling Hierarchy | Execution > Production Planning (tab) > Work Orders (secondary tab) > select record > {View Scheduling Hierarchy} > [Go] |