JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Netra Server X3-2 HTML Document Collection
search filter icon
search icon

Document Information

Using This Documentation

Product Notes

Related Documentation

Feedback

Access to Oracle Support

Installation

Understanding the Server

Installation Task Overview

Server Overview

Front Panel Components (Installation)

Rear Panel Components (Installation)

Confirming Server and Site Specifications

Physical Specifications

Minimum Clearance for Service Access

AC and DC Power Supply Specifications

Input Power Information

Overcurrent Protection Requirements

DC Power Source, Power Connection, and Grounding Requirements

Environmental Requirements

Acoustic Noise Emissions

Airflow Clearance

Preparing for Installation

Shipping Kit Inventory

Handling Precautions

ESD Precautions

Tools Needed for Installation

Optional Components

Rack Cautions

Stabilize the Rack

Installing the Server in a 4-Post Rack

Installing the Standard 19-Inch Hardmount Kit (4-Post Rack)

Installing the 19-Inch Sliding-Rail Kit (4-Post Rack)

Installing the 600-mm Hardmount Kit (4-Post Rack)

Installing the Server in a 2-Post Rack

Installing the 19-Inch Hardmount Kit (2-Post Rack)

Installing the 19-Inch Sliding-Rail Kit (2-Post Rack)

Installing the 23-Inch Hardmount Kit (2-Post Rack)

Connecting Cables

Connecting Data and Management Cables

Identifying Ports

Powering On the Server the First Time

Connect AC Power Cords

Assembling DC Power Cords and Applying DC Power

Connect the Chassis Ground Wire

Assemble the DC Input Power Cord

Install Strain Relief Housings

Connect DC Power Cords

Power On the Host for the First Time

OS Installation

Choosing an OS Installation Method

OS Installation Task Map (Oracle Solaris)

OS Installation Task Map (Oracle VM)

OS Installation Task Map (Linux)

OS Installation Task Map (VMware ESXi)

OS Installation Task Map (Windows)

Supported OS Versions and Documentation

Oracle Linux Support Kernel

Understanding Installation Methods

Configuring the Preinstalled Oracle Solaris OS

Preinstalled OS RAID Limitations

Configuration Worksheet (Oracle Solaris)

Configure the Preinstalled Oracle Solaris OS

Configuring the Preinstalled Oracle VM 3. 0 Software

Configuration Worksheet (Oracle VM Server)

Configure the Preinstalled Oracle VM 3.0 OS

Oracle VM 3.0 Overview

Preparing to Install an OS

Selecting the Console Display

Selecting the Boot Media

Preparing Your PXE Environment

Accessing Installation Utilities

Setting Up BIOS

Configuring RAID

HBA and RAID Support

RAID Configuration Requirements

Post-Installation RAID Volume Creation

Configure RAID (OSA)

Configuring RAID Volumes (LSI BIOS Utilities)

Installing a Supported OS

Install an OS (OSA)

Installing an OS (Media)

Install an OS (PXE)

Performing Post-Installation Tasks

(Optional) Assign Boot Drive Priorities

Oracle VM Post-Installation Information

Performing Linux Post-Installation Tasks

Performing VMware ESXi Post-Installation Tasks

Performing Windows Post-Installation Tasks

Administration

Understanding Administration Resources

Common Administration Tools

Oracle ILOM Overview

BIOS Overview (Administration)

OSA Overview

HMP

Hardware RAID Administration Tools

Multiple Server Management Tools

Accessing Administration Tools

Accessing Oracle ILOM

Accessing BIOS

Accessing OSA

Access Add-On Card Configuration Utilities (BIOS)

Controlling the Server

Controlling the Power State

Change Telco Alarm States Manually

Configuring Power-On and Boot Options

Configuring Power-On Policies

Selecting a Boot Device

Configuring Oracle ILOM

Change the Oracle ILOM Root Password (Oracle ILOM CLI)

Recover the Oracle ILOM Root Password

Configuring Oracle ILOM (Oracle ILOM Web Interface)

Configuring the SP and Oracle ILOM (BIOS)

Configure the SP and Oracle ILOM (OSA)

Configure the Enhanced PCIe Cooling Mode Policy (Oracle ILOM CLI)

Configuring BIOS

Resetting the BIOS to Default Settings

Configuring Legacy Option ROM Allocation

Configuring I/O Resource Allocation

Configuring Devices in BIOS

Enabling or Disabling OSA

Disable OSA

Enable OSA

Monitoring the Server

Obtain the Server Serial Number

Locate the Server (Oracle ILOM Web Interface)

Obtaining Server Information

Monitoring the Server Health (Oracle ILOM Web Interface)

Understanding SNMP Traps

Updating the Firmware and Software

Update to a New OSA Release

Obtain and Update Firmware (OSA)

Restore OSA

Mounting the Oracle System Assistant USB Flash Drive

Obtaining Updated Software

Requesting Updates on Physical Media

Service

Identifying Components

Component Locations (Storage, Power, and Fans)

Component Locations (Motherboard, Memory, and PCIe3 Cards)

Front Panel Components (Service)

Rear Panel Components (Service)

Detecting and Managing Faults

Understanding Diagnostics

Interpreting Diagnostic LEDs

Troubleshooting (Oracle ILOM /SP Targets)

BIOS POST Event Messages

Troubleshooting (Oracle ILOM /System Targets)

Displaying Faulty Components

Troubleshooting (Oracle ILOM Legacy Targets)

Troubleshooting (Pc-Check)

Preparing for Service

Safety Information

Tools Needed for Service

Filler Panels

Find the Server Serial Number

Component Service Task Reference

Locate the Server

Removing Power From the Server

Accessing Internal Components

Remove the Fan Tray

Raise the Drive Cage to the Service Position

Remove the Air Duct

Remove the PDB Duct

Servicing the Filter

Remove the Filter

Install the Filter

Servicing Drives

Drive Configuration

Drive LEDs

Locate a Faulty Drive

Remove a Drive

Install a Drive

Verify a Drive

Servicing the DVD Drive

Remove the DVD Drive

Install the DVD Drive

Servicing Power Supplies

Power Supply LEDs

Locate a Faulty Power Supply

Remove a Power Supply

Install a Power Supply

Verify a Power Supply

Servicing Fan Modules

Fan Module LEDs

Locate a Faulty Fan Module

Remove a Fan Module

Install a Fan Module

Verify a Fan Module

Servicing Risers

Riser Configuration

Locate a Faulty Riser

Remove a Riser

Install a Riser

Verify a Riser

Servicing PCIe3 Cards

PCIe3 Card Configuration

Locate a Faulty PCIe3 Card

Remove a PCIe3 Card (Risers 1 and 2)

Remove a PCIe3 Card (Riser 3)

Install a PCIe3 Card (Risers 1 and 2)

Install a PCIe3 Card (Riser 3)

Verify a PCIe3 Card

Servicing the Battery

Remove the Battery

Install the Battery

Servicing the USB Drive

USB Drive LED

Remove the USB Drive

Install the USB Drive

Servicing Cables

Cable Configuration

Remove the Drive Signal Cable

Install the Drive Signal Cable

Remove the Drive Power Cable

Install the Drive Power Cable

Remove the DVD SATA Cable

Install the DVD SATA Cable

Remove the PDB Signal Cable

Install the PDB Signal Cable

Servicing the Drive Backplane

Drive Backplane Configuration

Determine if the Drive Backplane Is Faulty

Remove the Drive Backplane

Install the Drive Backplane

Verify the Drive Backplane

Servicing DIMMs

DIMM Configuration

Locate a Faulty DIMM

Remove a DIMM

Install a DIMM

Verify a DIMM

Servicing CPUs

CPU Configuration

Locate a Faulty CPU

CPU Tool

Remove a CPU

Install a CPU

Servicing the LED Board

Determine if the LED Board Is Faulty

Remove the LED Board

Install the LED Board

Verify the LED Board

Servicing the USB Board

Remove the USB Board

Install the USB Board

Servicing the Motherboard

Determine if the Motherboard Is Faulty

Remove the Motherboard

Install the Motherboard

Verify the Motherboard

Servicing the PDB

Determine if the PDB Is Faulty

Remove the PDB

Install the PDB

Verify the PDB

Returning the Server to Operation

Install the PDB Duct

Install the Air Duct

Secure the Drive Cage

Install the Fan Tray

Install the Top Cover

Connect Power Cords

Power On the Server (Oracle ILOM)

Power On the Server (Power Button)

Glossary

Index

Assemble the DC Input Power Cord

Assemble one DC input power cable for each DC power input to your server.

  1. Verify that you have met these conditions:
  2. If the power cables are already connected to a DC power source, de-energize the cables by removing fuses, opening circuit breakers, or turning off the DC source.

    Electrical

    Caution - Do not proceed with these instructions until you are sure that there is no voltage present on the DC power cables.


  3. Identify the parts that you will use to assemble the DC input power cables.

    For each cable, you need the items shown in this illustration. These items are included in the shipping kit that came with your server.


    image:A figure showing the DC connection parts.
    No.
    Description
    1
    Strain relief housing
    2
    DC input plug
    3
    Cage clamp operating lever
  4. Locate the three wires coming from your DC power source that will be used for the connection to your server:
    • -48V or -60V (negative terminal)

    • Chassis ground

    • -48V or -60V Return (positive terminal)


      Note - Depending on the DC power source, the -48V or -60V (negative terminal) might be marked with a minus (-) symbol. The -48V or -60V Return (positive terminal) might be marked with a positive (+) symbol.


  5. Strip 5/16 in. (8 mm) of insulation from each of the wires coming from the DC power source.

    Do not strip more than 5/16 in. (8 mm) from each wire. Doing so leaves uninsulated wire exposed from the DC connector after the assembly is complete.


    image:A figure showing the maximum amount of insulation to strip from the wire.
    No.
    Description
    1
    5/16 in. (8 mm) maximum
  6. Open the cage clamp for this section of the DC input plug by taking one of these actions:
    • Insert the tip of the cage clamp operating lever into the rectangular hole directly above the hole in the DC input plug where you want to insert the first wire. Press down on the cage clamp operating lever. See the first figure.

    • Insert a small slotted screwdriver into the rectangular hole directly above the hole in the DC input plug where you want to insert the first wire. Push in to open the cage clamp. See the second figure.


    image:A figure showing how to open the DC input plug cage clamp.
    No.
    Description
    1
    DC input plug

    image:A figure showing how to open the cage clamp using a screwdriver.
    No.
    Description
    1
    DC input plug
  7. Feed the exposed section of the appropriate wire into the round hole in the DC input plug.
    image:A figure showing the DC plug wiring assignments.
    No.
    Description
    1
    Top of connector
    2
    From -48V or -60V return
    3
    From chassis ground (green/yellow)
    4
    From -48V or -60V

    Note - If you need to remove a wire from the DC input plug, insert the cage clamp operating lever or a small screwdriver and pull the wire from the DC input plug.


  8. Release the lever or remove the tool to secure the wire into the connector.
  9. Repeat the procedures for the other two wires to complete the assembly of the DC input power cable.
  10. Repeat this procedure to create as many DC input power cables as you need for your unit.
  11. Install strain relief housings.

    See Install Strain Relief Housings.

Related Information