Updating Cube Linkage After Essbase Studio Rehosting

If you have rehosted Essbase Studio Server (for example,after upgrade), follow the procedure in this topic.

See the Oracle Hyperion Enterprise Performance Management System Installation and Configuration Guide for complete information on EPM System product rehosting.

Note:

Always perform the rehosting steps for Essbase before performing the steps in this procedure. See Updating References to a Rehosted Essbase Server for more information.

  After Essbase Studio rehosting, to update the cube linkage for cubes built using Essbase Studio:

  1. In Essbase Studio Console, select Tools, and then Update Cube Linkage.

  2. Select Update all Essbase applications and databases to link to the current Essbase Studio Server (all Essbase instances must be started).

    All Essbase applications and databases will be linked to the Essbase Studio Server to which you are currently connected.

    Note:

    All Essbase instances or clusters must be running for the cube linkage update to take effect.

  3. Optional: To keep all Essbase applications running after the update, clear the Stop all Essbase applications after the update check box.

    The default is to stop all Essbase applications after update.

  4. Click Update.

    A message indicates that the cube linkage update is successful.

    If unsuccessful, an error message shows the details.

  5. To exit, click Close.