Cross-cube
Production
Required
"Production Required"[level(Week)] = "Production Required" + Production.Required
"Production Required"[level(Week)] ="Production Required" + deltaValue(Production.Required)
Dimension | Rollup | Rolldown |
---|---|---|
BOM | None | None |
Manufacturing | Sum | None |
Plants | Sum | None |