In This Section:
Installing Integrated Operational Planning on a Server
Installing Integrated Operational Planning in a Distributed Environment
Installing Integrated Operational Planning as an NT Service
Installing Multiple Instances of Integrated Operational Planning on the Same Server
Enabling Oracle HTTP Server as a Proxy
Enabling Microsoft Internet Information Services (IIS) 7 as a Proxy
Enabling Microsoft Internet Information Services (IIS) 6 as a Proxy
Before installing and configuring the Integrated Operational Planning server:
Ensure that your server meets the minimum hardware and software prerequisites. See System Requirements.
Ensure that WebLogic Admin Server and Foundation Services server are running.
Install Integrated Operational Planning on the same server as Foundation Services.