You can add any measure value in a worksheet to a key metric. For example, you can add the value of a measure during a time period or for a product component to a key metric. The key metrics that you modify in a planning worksheet are calculated and displayed along with the default key metrics associated with a scenario.
To add a measure to a key metric:
Right-click the worksheet cell containing the desired measure value.
Delta—How to display the key metric value:
Relative—The difference between the absolute value and the value calculated using the base data in Integrated Operational Planning. For example, the value might correspond to the difference between an actual value and a plan value.
Absolute—The absolute value of the measure calculated using data in the scenario sandbox. For example, the value might correspond to an actual value entered into a planning workbook during an analysis.
Add to Analysis Type—Whether to permanently add the key metric to the analysis type associated with the scenario. If you select this option, the key metric will be calculated and displayed for future scenarios created with this analysis type. If you do not select this option, the key metric is associated only with the scenario in this planning worksheet.